Attachment SESLIC2017021600179.

SESLIC2017021600179.

DECISION submitted by FCC

GRANT

0000-00-00

This document pretains to SES-LIC-20170216-00179 for License on a Satellite Earth Station filing.

IBFS_SESLIC2017021600179_1203213

                                                      UNITED STATES OF AMERICA
                                                 FEDERAL COMMUNICATIONS COMMISSION

                                                RADIO STATION AUTHORIZATION
    Name: New York, State of                                                                                   Call Sign: E170065
    Authorization Type: License                                                                              File Number: SES—LIC—20170216—00179
    Non Common Carrier                          Grant date:        03/23/2017       Expiration Date:         03/23/2032,




Nature of Service: Fixed Satellite Service

 Class of Station: Fixed Earth Stations

A) Site Location(s)
                                                                                                                  Elevation          Special Provisions
# Site ID                               Address                             Latitude          Longitude            (Meters)     NAD (Refer to Section H)

1) 1                     14 Farr Rd                                       43°19‘58.0"N        73°42‘1.0"W             146           83
                         Queensbury,        Washington,        NY
                         12804

                         Licensee certifies antenna(s)                    comply with gain patterns specified in Section 25.209




Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
below for radio communications for the term beginning March 23, 2017 (3 AM Eastern Standard Time) and ending March 23,
2032 (3 AM Eastern Standard Time) . The required date of completion of construction and commencement of operation is
March 23, 2018 (3 AM Eastern Standard Time) . Grantee must file with the Commission a certification upon completion of
construction and commencement of operation.


B) Particulars of Operations

The General Provision 1010 applies to all receiving frequency bands.
The General Provision 1900 applies to all transmitting frequency bands.
For the text of these provisions, refer to Section H.
                                                                                 Max     Max EIRP                       Special
                                                                                EIRP      Density                     Provisions
            Frequency                 Polarization                  Tx/Rx     /Carrier   /Carrier       Associated     (Refer t90        Modulation/
#              (MHz)                      Code           Emission Mode        (dBW) (dBW/4KkHZ) Antenna               Section H)           Services
1) 14000.0000—14500.0000                 H, V           36KS5G7D     Tx        44 .74         35 .14     1                               Digital data services

2) 14000.0000—14500.0000                 H, V           3M00G7D      Tx        60 .74         3499       3                               Digital data services

3) 11700.0000—12200.0000                 H,V            1M00G7D      Rx                                  1                               Digital data services

4) 11700.0000—12200.0000                 H.V        30M0G7D          Rx                                  1                               Digital data services



C) Frequency Coordination Limits

                                                          Satellite Arc           Elevation               Azimuth          Max EIRP
                        22.                               (Deg. Long.)            (Degrees)               (Degrees) Density toward
            Frequency Limits                             East     West          East    West            East    West    Horizon                  Associated
#                (MHz)                                  Limit     Limit        Limit    Limit          Limit    Limit (dBW/4kHz)                 Antenna(s)
1)      11700 .0000—12200.0000                           60 .0W—143 . OW         38.1—06.3              160.4—255.5                         1



                                                                      ( page 1 of 4)                                                            FCC Form 488


                                                   UNITED STATES OF AMERICA
                                              FEDERAL COMMUNICATIONS COMMISSION

                                             RADIO STATION AUTHORIZATION

    Name: New York, State of                                                                                Call Sign: E170065
    Authorization Type: License                                                                        File Number: SES—LIC—20170216—00179
    Non Common Carrier                       Grant date:    03/23/2017           Expiration Date:       03/23/2032




C) Frequency Coordination Limits

                                                     Satellite Arc              Elevation              Azimuth             Max EIRP
               p           Limi                     (Deg. Long.)            (Degrees)                 (Degrees) Density toward
                   requency Limits                 East     West          East    West              East    West   Horizon                 Associated
#                     (MHz)                       Limit      Limit        Limit       Limit         Limit     Limit (dBW/A4kHz)            Antenna(s)
2)      14000.0000—14500.0000                     60 .0w—143 . OW          38 .1—06.3                160.4—255.5             —1.96    1


D) Points of Communications
      The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

     1) 1 to Permitted Space Station List

E) Antenna Facilities
                                                                                                                       .                                 Special
                                                                                                                    S‘te‘             Max               Provisions
     Site              Antenna                Diameter                                                           Elevation       Antenna Height          (Refer to
      ID                 ID          Units    (meters)         Manufacturer                  Model number        (Meters)           (Meters)            Section H)
                           1           1         2 .4                Prodelin                       1244         146           2.4 AGL/   148.4 AMSL

        Max Gains(s) :                49.2   dBi @         14.1250 GHz             47.4     oBi @       11.7250 CGHz
        Maximum total input power at antenna flange (Watts) =                                        14 .26
        Maximum aggregate output EIRP for all carriers (dBW) =                                       60 .74




F) Remote Control Point:
1                       1220 Washington Ave,       Bldg 22,,     State Office Campus                             Call Sign:

                        Albany, Albany, NY 12226
                        5182922200


G) Antenna Structure marking and lighting requirements:
            None unless otherwise specified under Special and General Provisions


H) Special and General Provisions
       A)This RADIO STATION                  AUTHORIZATION is granted subject to the following special provisions and general
         conditions:
            1010 ——— Applicable to all receiving frequency bands. Emission designator indicates the maximum bandwidth of received
                     signal at associated station(s). Maximum EIRP and maximum EIRP density are not applicable to receive
                     operations.



                                                                ( page 2 of 4)                                                            FCC Form 488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                    RADIO STATION AUTHORIZATION

Name: New York, State of                                                                 Call Sign: E170065
Authorization Type: License                                                          File Number: SES—LIC—20170216—00179
Non Common Carrier                 Grant date:    03/23/2017      Expiration Date:     03/23/2032




H) Special and General Provisions
   A)This RADIO STATION             AUTHORIZATION is granted subject to the following special provisions and general
     conditions:
     1900 ——— Applicable to all transmitting frequency bands. Authority is granted to transmit any number of RF carriers with
              the specified parameters on any discrete frequencies within associated band in accordance with the other terms
              and conditions of this authorization, subject to any additional limitations that may be required to avoid
              unacceptable levels of inter—satellite interference.
     2010 ——— This authorization is issued pursuant to the Commission‘s Second Report and Order adopted June 16, 1972 (35
              FCC 2d 844) and Memorandum, Opinion and Order adopted December 21, 1972 (38 FCC 2d 665) in Docket No.
              16495 and is subject to the policies adopted in that proceeding.
     2300 ——— Authority is granted to operate this station by remote control provided that: (1)the parameters of the transmissions
              of this station monitored at the remote control point, and the operational functions sufficient to ensure that the
              operations of this station are in full compliance with the station authorization at all times; (2) upon detection by
              the grantee, or upon notification from the Commission, of a deviation of the operation of this station,
              transmissions shall be immediately suspended until the deviation is corrected, except that transmissions
              concerning the immediate safety of life or property may be conducted for the duration of such emergency; and (3)
              the grantee shall have available, at all times, the technical personnel necessary to perform the technical servicing
              and maintenance of this station expeditiously. See also Public Notice "The International Bureau Provides
              Guidance Concerning the Relocation of Earth Station Remote Control Points", DA 06—978 (rel. May 4, 2006).
     2916 ——— Transmitter(s) must be turned off during antenna maintenance to ensure compliance with the FCC—specified safety
              guidelines for human exposure to radiofrequency radiation in the region between the antenna feed and the
              reflector. Appropriate measures must also be taken to restrict access to other regions in which the earth station‘s
              power flux density levels exceed the specified guidelines.
     2938 ——— Upon completion of construction, each licensee must file with the Commission a certification including the
              following information: (1) name of the licensee, (2) file number of the application, (3) call sign of the antenna, (4)
              date of the license, (5) certification that the facility as authorized has been completed, (6) certification that each
              antenna facility has been tested and is within 2 dB of the pattern specified in Section 25.209, and (7) certification
              that the station is operational (including the date of commencement of service) and will remain operational during
              the license period unless the license is submitted for cancellation.
     3219 ——— All existing transmitting facilities, operations and devices regulated by the Commission must be in compliance
              with the Commission‘s radiofrequency (RF) exposure guidelines, pursuant to Section 1.1307(b)(1) through (b)(3)
              of the Commission‘s rules, or if not in compliance, file an Environmental Assessment (EA) as specified in Section
              1.1311. See 47 CFR § 1.1307 (b) (5).
     5208 ——— The licensee shall take all necessary measures to ensure that the antenna does not create potential exposure of
              humans to radiofrequency radiation in excess of the FCC exposure limits defined in 47 CFR 1.1307(b) and
              1.1310 wherever such exposures might occur. Measures must be taken to ensure compliance with limits for both
              occupational/controlled exposure and for general population/uncontrolled exposure, as defined in these rule
              sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
              Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
              measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fcec.gov/oet/rfsafety) provides information
              on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
              signs and protective equipment for workers.




                                                     ( page 3 of 4 )                                                FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: New York, State of                                                                Call Sign: E170065
Authorization Type: License                                                          File Number: SES—LIC—20170216—00179
Non Common Carrier                 Grant date:   03/23/2017       Expiration Date:    03/23/2032




   B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:

              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakings described will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. § 303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission‘s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
              designated frequencies beyond the term of this license, nor in any other manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

             This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
             Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              17.4.                                                       ‘

             The following condition applies when this authorization permits construction of or modifies the construction
             permit of a radio station.

             This authorization shall be automatically forfeited if the station is not ready for operation by the required date of
             completion of construction unless an application for modification of authorization to request additional time to
             complete construction is filed by that date, together with a showing that failure to complete construction by the
             required date was due to factors not under control of the grantee.

             Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
             collect annual regulatory fees from regulatees is contained in Public Law 103—66, "The Omnibus Budget
             Reconciliation Act of 1993." These regulatory fees, which are likely to change each fiscal year, are used
             to offset costs associated with the Commission‘s enforcement, public service, international and policy and
             rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
             fee rates. Receive only earth stations are exempt from payment of regulatory fees.




                                                     ( page 4 of 4 )                                               FCC Form 488



Document Created: 2017-03-29 17:15:46
Document Modified: 2017-03-29 17:15:46

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC