Attachment SESLIC2017020700125.

SESLIC2017020700125.

DECISION submitted by FCC

GRANT

0000-00-00

This document pretains to SES-LIC-20170207-00125 for License on a Satellite Earth Station filing.

IBFS_SESLIC2017020700125_1202600

                                                      UNITED STATES OF AMERICA
                                                 FEDERAL COMMUNICATIONS COMMISSION

                                                RADIO STATION AUTHORIZATION

 Name: CBS Communications Services Inc.                                                                         Call Sign: E170047
 Authorization Type: License                                                                                 File Number: SES—LIC-201702QTZ.-‘00125
                                                                                                                                      Sssssiittse,
 Non Common Carrier                             Grant date:       —03/16/2017       Expiration Date:          03/16/2032                  &




Nature of Service: Fixed Satellite Service

Class of Station: Temporary Fixed Earth Station

A) Site Location(s)
                                                                                                                   Elevation              Special Provisions
# Site ID                               Address                              Latitude        Longitude              (Meters)         NAD (Refer to Section H)

1) 1                                                                                                                                 Na


                         Licensee certifies antenna(s)                    comply with gain patterns specified in Section 25.209




Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
belowfor radio communications for the term beginning March 16, 2017 (3 AM Eastern Standard Time) and ending March 16,
2032 (3 AM Eastern Standard Time) . The required date of completion of construction and commencement of operation is
March 16, 2018 (3 AM Eastern Standard Time) . Grantee must file with the Commission a certification upon completion of
construction and commencement of operation.


B) Particulars of Operations

The General Provision 1010 applies to all receiving frequency bands.
The General Provision 1900 applies to all transmitting frequency bands.
For the text of these provisions, refer to Section H.
                                                                                 Max      Max EIRP                        Special
                                                                                EIRP       Density                      Provisions
            Frequency                 Polarization                   Tx/Rx     /Carrier    /Carrier     Asgociated         (Refer to      Modulation/
#              (MHZ)                      Code           Emission    Mode      (dBW)      (dBWM’kHZ)     Antenna        Section H)         Services

1) 14000.0000—14500.0000                 H, V           36MOG7W       Tx        69.94          3039      3                              MCPC Digital Carrier          for
                                                                                                                                        Voice/Audio/Data

2) 11700.0000—12200.0000                 H,V            36MOG7W       Rx        0 .00          0 .00     1                              MCPC      Digital   Carrier   for
                                                                                                                                        Voice/Audio/Data



C) Frequency Coordination Limits

                                                          Satellite Arc            Elevation                 Azimuth        Max EIRP
                             22.                          (Deg. Long.)             (Degrees)              (Degrees)     Density toward
            Frequency Limits                             East       West         East      West         East      West    Horizon                  Associated
#                (MHz)                                  Limit       Limit       Limit      Limit       Limit      Limit (dBW/4kHz)                 Antenna(s)
1)     11700.0000—12200.0000                             60 .0w—140 . ow          05.0—05 .0                                                  1
2)     14000.0000—14500.0000                             60 .0w—140 . OW          05.0—05 .0            000 .0—000 .0            .            1



                                                                       ( page 1 of 4)                                                             FCC Form 488


                                             UNITED STATES OF AMERICA
                                        FEDERAL COMMUNICATIONS COMMISSION

                                       RADIO STATION AUTHORIZATION

Name: CBS Communications Services Inc.                                                         Call Sign: E170047
Authorization Type: License                                                                 File Number: SES—LIC—20170207—00125
Non Common Carrier                     Grant date:    03/16/2017       Expiration Date:      03/16/2032




D) Points of Communications
  The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

 1) 1 to Permitted Space Station List


E) Antenna Facilities
                                                                                                          .                            Special
                                                                                                      Site               Max         Provisions
 Site            Antenna                Diameter                                                    Elevation       Antenna Height     Refer to
  ID               ID          Units    (meters)        Manufacturer               Model number      Met
                                                                                                    (Meters)           (Meters) 8    Section H)
                     1           1         1.35        General Dynamics                C135                              4 AGL

    Max Gains(s):               44.5 dBi @           14.2500 GHz
    Maximum total input power at antenna flange               (Watts)      =            350 .00
    Maximum aggregate output EIRP for all carriers                 (dBW)       =          69 .94




G) Antenna Structure marking and lighting requirements:
        None unless otherwise specified under Special and General Provisions


H) Special and General Provisions
   A)This RADIO STATION                 AUTHORIZATION is granted subject to the following special provisions and general
     conditions:
        1010 ——— Applicable to all receiving frequency bands. Emission designator indicates the maximum bandwidth of received
                 signal at associated station(s). Maximum EIRP and maximum EIRP density are not applicable to receive
                 operations.                                                                                    .
        1900 ——— Applicable to all transmitting frequency bands. Authority is granted to transmit any number of RF carriers with
                 the specified parameters on any discrete frequencies within associated band in accordance with the other terms
                 and conditions of this authorization, subject to any additional limitations that may be required to avoid
                 unacceptable levels of inter—satellite interference.
        2010 ——— This authorization is issued pursuant to the Commission‘s Second Report and Order adopted June 16, 1972 (35
                 FCC 2d $44) and Memorandum, Opinion and Order adopted December 21, 1972 (38 FCC 2d 665) in Docket No.
                 16495 and is subject to the policies adopted in that proceeding.
        2916 ——— Transmitter(s) must be turned off during antenna maintenance to ensure compliance with the FCC—specified safety
                 guidelines for human exposure to radiofrequency radiation in the region between the antenna feed and the
                 reflector. Appropriate measures must also be taken to restrict access to other regions in which the earth station‘s
                 power flux density levels exceed the specified guidelines.




                                                         ( page 2 of 4 )                                                  FCC Form 488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: CBS Communications Services Inc.                                                  Call Sign: E170047
Authorization Type: License                                                           File Number: SES—LIC—20170207—00125
Non Common Carrier                 Grant date:    03/16/2017       Expiration Date:   03/16/2032




H) Special and General Provisions
   A)This RADIO STATION            AUTHORIZATION is granted subject to the following special provisions and general
      conditions:
     2938 ——— Upon completion of construction, each licensee must file with the Commission a certification including the
              following information: (1) name of the licensee, (2) file number of the application, (3) call sign of the antenna, (4)
              date of the license, (5) certification that the facility as authorized has been completed, (6) certification that each
              antenna facility has been tested and is within 2 dB of the pattern specified in Section 25.209, and (7) certification
              that the station is operational (including the date of commencement of service) and will remain operational during
              the license period unless the license is submitted for cancellation.
     3219 ——— All existing transmitting facilities, operations and devices regulated by the Commission must be in compliance
              with the Commission‘s radiofrequency (RF) exposure guidelines, pursuant to Section 1.1307(b)(1) through (b)(3)
              of the Commission‘s rules, or if not in compliance, file an Environmental Assessment (EA) as specified in Section
              1.1311. See 47 CFR § 1.1307 (b) (5).
     5208 ——— The licensee shall take all necessary measures to ensure that the antenna does not create potential exposure of
              humans to radiofrequency radiation in excess of the FCC exposure limits defined in 47 CFR 1.1307(b) and
              1.1310 wherever such exposures might occur. Measures must be taken to ensure compliance with limits for both
              occupational/controlled exposure and for general population/uncontrolled exposure, as defined in these rule
              sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
              Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
              measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fec.gov/oet/rfsafety) provides information
              on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
              signs and protective equipment for workers.




                                                      ( page 3 of 4)                                                FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: CBS Communications Services Inc.                                                  Call Sign: E170047
Authorization Type: License                                                          File Number: SES—LIC—20170207—00125
Non Common Carrier                 Grant date:   03/16/2017       Expiration Date:   03/16/2032




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:

              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakings described will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. §303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission‘s
              Rules. 47 C.E.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
              designated frequencies beyond the term of this license, nor in any other manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              17.4.

              The following condition applies when this authorization permits construction of or modifies the construction
              permit of a radio station.

             This authorization shall be automatically forfeited if the station is not ready for operation by the required date of
             completion of construction unless an application for modification of authorization to request additional time to
             complete construction is filed by that date, together with a showing that failure to complete construction by the
             required date was due to factors not under control of the grantee.

             Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
             collect annual regulatory fees from regulatees is contained in Public Law 103—66, "The Omnibus Budget
             Reconciliation Act of 1993." These regulatory fees, which are likely to change each fiscal year, are used
             to offset costs associated with the Commission‘s enforcement, public service, international and policy and
             rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
             fee rates. Receive only earth stations are exempt from payment of regulatory fees.




                                                     ( page 4 of 4)                                                FCC Form 488



Document Created: 2017-03-23 13:41:07
Document Modified: 2017-03-23 13:41:07

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC