Attachment 20160728173721.pdf

20160728173721.pdf

DECISION submitted by FCC-IB

Grant

2016-08-01

This document pretains to SES-LIC-20160509-00403 for License on a Satellite Earth Station filing.

IBFS_SESLIC2016050900403_1145233

                                              UNITED STATES OF AMERICA
                                         FEDERAL COMMUNICATIONS COMMISSION

                                      RADIO STATION AUTHORIZATION
 Name: Kenneth Copeland Ministrics                                                            Call Sign: E160077
 Authorization Type: License                                                              File Number: SES—LIC—20160509—00403
 Non Common Carrier                   Grant date:    06/14/2016        Expiration Date:   06/14/2031                  ge




Nature of Service: Fixed Satellite Service
Class of Station: Fixed Earth Stations

A) Site Location(s)
                                                                                                 Elevation         Special Provisions
#° Site ID                      Address                         Latitude      Longitude           (Meters)    NAD (Refer to Section H)

31 1               14355 Morris Dido Road                 32°59 °21. 0°N      87929 47. 0W         235.92      83
                   (4.90.)
                   Newark, Wise, x reom.
                   Licensee certifies antenna(s) comply with gain patterns specified in Section 25.209


Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
belowfor radio communications for the term beginning June 14, 2016 (3 AM Eastern Standard Time)_ and ending June 14,
2031 (3 AM Eastern Standard Time) . The required date ofcompletion ofconstruction and commencement ofoperation is June
14, 2017 (3 AM Eastern Standard Time) . Grantee must file with the Commission a certification upon completion of
construction and commencement of operation.


B) Particulars of Operations
                                                                    Max Max EIRP
                                                                   EIRP Density
          Frequency            Polarization            Ts /Rx     ICarrier /Ca¥r®® Kesociated        Special Provisions    Modulation/
#           (MHz)                 Code        Emission Mode       (dBW) (IBWAKH2) Antonnga          (Refer to Section H)    Services

1) e245.0000—6325.0000           wy       mesore         Tx        s7.20     32.20    a.9m.                         Digital traffic,
                                                                                                                    FEC,     data        rate
                                                                                                                    modulation
2) 5245.0000—6325.0000           y        semork         3x       milss      s2.10    a.9m.                         Digital traffic,
                                                                                                                    FEC,     data        rate
                                                                                                                    modulation
31 sses.0000—6085 . 0000         my       masore         Tx       s7.10      32.20    4.9M.                         Digital traffic,
                                                                                                                    FEC,    data   rate
                                                                                                                    modulation
41 sses.0000—6085 .0000          wy       semork                  m.64       s2.10    a.90.                         pigital traffic,
                                                                                                                    rC,      data        rate
                                                                                                                    modulation

51 3700.0000—4200 .0000                   masore                                                                    Digital traffic,
                                                                                                                    FEC,    data   rate
                                                                                                                    modulation
81 3700.0000—1200.0000                    semorn                                                                    Digital traffic,
                                                                                                                    FEC,    data         rate
                                                                                                                    modulation




                                                         (page 1 of 5)                                                     FCC Form 488


                                                      UNITED STATES OF AMERICA
                                                 FEDERAL COMMUNICATIONS COMMISSION

                                                RADIO STATION AUTHORIZATION

Name: Kenneth Copeland Ministries                                                                         Call Sign: E160077
Authorization Type: License                                                                         File Number: SES—LIC—20160509—00403
Non Common Carrier                              Grant date:   06/14/2016        Expiration Date:         06/14/2031




C) Frequency Coordination Limits

                                                       Satellite Arc          Elevation            Azimuth            Max EIRP
              F              Limi                      (Deg. Long.)           (Degrees)           (Degrees) Density toward
                  requency     Limits                  East    West         East    West        East    West   Horizon                  Associated
#                    (MHz)                           Limit     Limit       Limit     Limit      Limit       Limit (dBW/4kHz)            Antenna(s)
1)          3700.0000—4200.0000                       60.0W—139.0#          34.6—31.5            125.4—238.4                       4 . 9M.
2)          s985.0000—6085.0000                       60.0w—139 .0#         34.6—31.5            125.4—238.4                —22    4.9M.
3)          6245.0000—6325.0000                       60.0w—139 .0#         34.6—31.5            125.4—238.4                —22    4.9M.


D) Points of Communications

     ALSAT: An ALSAT earth station license authorizes the licensee to communicate with all U.S.—licensed satellites, and all
     non—U.S.—licensed satellites on the Permitted List, with respect to the services and frequency bands specified on the Permitted
     List for each satellite.


E) Antenna Facilities
                                                                                                                  s                                    Special
                                                                                                                   ite             Max               Provisions
     Site             Antenna                    Diameter                                                       Elevation      Antenna Height        (Refer to
     ID                 ID              Units      (meters)      Manufacturer             Model number          (Meters)          (Meters)           Section H)
                       4 . 9M.            1          4 .9          ASC Signal                   4 . 9M          235.92       5 AGL/ 240.9 AMSL

          Max Gains(s) :                 46.2 dBi @           6.1750 GHz           42.2 aBi o            3.9500 GHz
          Maximum total input power at antenna flange (Watts) =                                  350 .00
          Maximum aggregate output EIRP for all carriers (dBW) =                                  71 .64




G) Antenna Structure marking and lighting requirements:
      None unless otherwise specified under Special and General Provisions




                                                                  ( page 2 of 5)                                                     FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: Kenneth Copeland Ministries                                                         Call Sign: E160077
Authorization Type: License                                                             File Number: SES—LIC—20160509—00403
Non Common Carrier                 Grant date:    06/14/2016         Expiration Date:   06/14/2031




H) Special and General Provisions
   A)This RADIO STATION             AUTHORIZATION is granted subject to the following special provisions and general
      conditions:
      1010 ——— Applicable to all receiving frequency bands. Emission designator indicates the maximum bandwidth of received
               signal at associated station(s).   Maximum EIRP and maximum EIRP density are not applicable to receive
               operations.
      1900 ——— Applicable to all transmitting frequency bands. Authority is granted to transmit any number of RF carriers with
               the specified parameters on any discrete frequencies within associated band in accordance with the other terms
               and conditions of this authorization, subject to any additional limitations that may be required to avoid
              unacceptable levels of inter—satellite interference.
     2010 ——— This authorization is issued pursuant to the Commission‘s Second Report and Order adopted June 16, 1972 (35
              FCC 2d 844) and Memorandum, Opinion and Order adopted December 21, 1972 (38 FCC 2d 665) in Docket No.
              16495 and is subject to the policies adopted in that proceeding.
     2300 ——— Authority is granted to operate this station by remote control provided that: (1)the parameters of the transmissions
              of this station monitored at the remote control point, and the operational functions sufficient to ensure that the
              operations of this station are in full compliance with the station authorization at all times; (2) upon detection by
              the grantee, or upon notification from the Commission, of a deviation of the operation of this station,
              transmissions shall be immediately suspended until the deviation is corrected, except that transmissions
              concerning the immediate safety of life or property may be conducted for the duration of such emergency; and (3)
              the grantee shall have available, at all times, the technical personnel necessary to perform the technical servicing
              and maintenance of this station expeditiously. See also Public Notice "The International Bureau Provides
              Guidance Concerning the Relocation of Earth Station Remote Control Points", DA 06—978 (rel. May 4, 2006).
     2916 ——— Transmitter(s) must be turned off during antenna maintenance to ensure compliance with the FCC—specified safety
              guidelines for human exposure to radiofrequency radiation in the region between the antenna feed and the
              reflector. Appropriate measures must also be taken to restrict access to other regions in which the earth station‘s
              power flux density levels exceed the specified guidelines.
     2938 ——— Upon completion of construction, each licensee must file with the Commission a certification including the
              following information: (1) name of the licensee, (2) file number of the application, (3) call sign of the antenna, (4)
              date of the license, (5) certification that the facility as authorized has been completed, (6) certification that each
              antenna facility has been tested and is within 2 dB of the pattern specified in Section 25.209, and (7) certification
              that the station is operational (including the date of commencement of service) and will remain operational during
              the license period unless the license is submitted for cancellation.
     3219 ——— All existing transmitting facilities, operations and devices regulated by the Commission must be in compliance
              with the Commission‘s radiofrequency (RF) exposure guidelines, pursuant to Section 1.1307(b)(1) through (b)(3)
              of the Commission‘s rules, or if not in compliance, file an Environmental Assessment (EA) as specified in Section
              1.1311. See 47 CFR § 1.1307 (b) (5).
     3941 ——— The antenna structure authorized herein must not pose or cause hazard(s) to Aviation Traffic. See Part 17, FCC
              Rules and Regulations.




                                                      ( page 3 of 5)                                                FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                  RADIO STATION AUTHORIZATION

Name: Kenneth Copeland Ministries                                                    Call Sign: E160077
Authorization Type: License                                                        File Number: SES—LIC—20160509—00403
Non Common Carrier               Grant date:   06/14/2016       Expiration Date:   06/14/2031




H) Special and General Provisions
   A)This RADIO STATION           AUTHORIZATION is granted subject to the following special provisions and general
     conditions:
     5208 ——— The licensee shall take all necessary measures to ensure that the antenna does not create potential exposure of
              humans to radiofrequency radiation in excess of the FCC exposure limits defined in 47 CFR 1.1307(b) and
              1.1310 wherever such exposures might occur. Measures must be taken to ensure compliance with limits for both
              occupational/controlled exposure and for general population/uncontrolled exposure, as defined in these rule
              sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
              Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
              measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fec.gov/oet/rfsafety) provides information
              on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
              signs and protective equipment for workers.
     5216 ——— All operations shall be on a non—common carrier basis.




                                                    ( page 4 of 5 )                                          FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION
Name: Kenneth Copeland Ministrics                                                       Call Sign: E160077
Authorization Type: License                                                          File Number: SES—LIC—20160509—00403
Non Common Carrier                Grant date:    06/14/2016       Expiration Date:    06/14/2031




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:
              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakings described will be carried out in goodfaith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) ofthe
              Communications Act. 47 U.S.C. §303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, companyor corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C.§ 706. Operation of this station is governed by Part 25 of the Commission‘s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee anyright to operate this station nor any right in the use of the
              designated frequencies beyond the term of this license, norin any other manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              17.4.

              Thefollowing condition applies when this authorization permits construction of or modifies the construction
              permit of a radio station.

              This authorization shall be automatically forfeited if the station is not ready for operation by the required date of
              completion of construction unless an application for modification of authorization to request additional time to
              complete construction is filed by that date, together with a showing that failure to complete construction by the
              required date was due to factors not under control ofthe grantee.

              Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
              collect annual regulatory fees from regulatees is contained in Public Law 103—66, "The Omnibus Budget
              Reconciliation Act of 1993." These regulatory fees, which are likely to change each fiscal year,are used
              to offset costs associated with the Commission‘s enforcement, public service, international and policy and
              rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
              fee rates, Receive only earth stations are exempt from payment of regulatory fees.




                                                     (page 5 of 5)                                                  FCC Form 488



Document Created: 2016-07-28 17:37:39
Document Modified: 2016-07-28 17:37:39

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC