Attachment 20160802153138.pdf

20160802153138.pdf

DECISION submitted by FCC-IB

Grant

2016-08-02

This document pretains to SES-LIC-20160427-00387 for License on a Satellite Earth Station filing.

IBFS_SESLIC2016042700387_1145301

                                                     UNITED STATES OF AMERICA
                                                FEDERAL COMMUNICATIONS COMMISSION

                                               RADIO STATION AUTHORIZATION

 Name: Peak Uplink, Inc                                                                                    Call Sign: E160073
 Authorization Type: License                                                                           File Number: SES—LIC—20160427—00387
 Non Common Carrier                            Grant date:        06/20/2016       Expiration Date:     06/20/2031~                           >




Nature of Service: Fixed Satellite Service
Class of Station: Temporary Fixed Earth Station

A) Site Location(s)
                                                                                                                Elevation                Special Provisions
#. Site ID                              Address                            Latitude       Longitude                  (Meters)   NAD (Refer to Section H)
1 :                      C/KU—Band hybrid                                                                                           wa
                         2.40/R0
                         vartous,
                         Licensee certifies antenna(s) do not comply with Section 25.209.                                  Please refer to Section
                         E for special conditions placed upon antennas at this site.


Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
belowfor radio communications for the term beginning June 20, 2016 (3 AM Eastern Standard Time) and ending June 20,
2031 (3 AM Eastern Standard Time) . The required date ofcompletion ofconstruction and commencement ofoperation is June
20, 2017 (3 AM Eastern Standard Time) . Grantee must file with the Commission a certification upon completion of
construction and commencement ofoperation.


B) Particulars of Operations

The General Provision 1010 applies toall receiving frequency bands.
The General Provision 1900 applies to all transmitting frequency bands.
For the text of these provisions, refer to Section H.
                                                                               Max      Max EIRP                          Special
            F                                                                EIRP       Density                          Provisions
                requency              Polarization                 Ta/Rx    /Carrier    /Carritr      Associat ted        (Refer to Modulation/
#         (MHz)                           Code       Emission Mode           (@BW) (@BW/AKHz) Antenna                    S€CON H)      Services
1) se25.0000—6425.0000                   mv         semoo7k    ry            67.04     27.50 2.4C                                    Digital traffic,         various
                                                                                                                                     modulations, FEC          rates,
                                                                                                                                     data rates.
2) se2s.0000—6425.0000                   my             sikzo7w      ry        38.60      27.s0       2.40                           Digital traffic,         various
                                                                                                                                     modulations, FEC           rates,
                                                                                                                                     data rates.
31 14000.0000—14500.0000                 W.¥        36H0G7M          ry      74.34        34.80       2.4k0                          Digital traffic,         various
                                                                                                                                     modulations, FEC          rates,
                                                                                                                                     data rates.
4) 14000.0000—14500.0000                &¥          SIK2GTH          y       45.87        34.80       2.4ru                          Digital traffic,         various
                                                                                                                                     modulations, FEC          rates,
                                                                                                                                     data rates.




                                                                     ( page 1 of 4 )                                                       FCC Form 488


                                                    UNITED STATES OF AMERICA
                                               FEDERAL COMMUNICATIONS COMMISSION

                                              RADIO STATION AUTHORIZATION

    Name: Peak Uplink, Inc                                                                                Call Sign: E160073
    Authorization Type: License                                                                        File Number: SES—LIC—20160427—00387
    Non Common Carrier                        Grant date:    06/20/2016         Expiration Date:        06/20/2031




    C) Frequency Coordination Limits

                                                     Satellite Arc           Elevation                 Azimuth          Max EIRP

                                                     (Deg. Long.)            (Degrees)                 (Degrees)      Density toward
                  Frequency Limits                  East      West        East       West      East          West        Horizon            Associated
    #                  (MHz)                       Limit      Limit       Limit      Limit    Limit          Limit (dBW/4kHz)               Antenna(s)
    1)          5925.0000—6425.0000                 18.0W—143.0#W          05. 0—05.0              000.0—000 .0                ~1.5     2. 4C

    2)      14000.0000—14500.0000                   18.0W—143.0W           05. 0—05.0              000.0—000 .0                 1.6     2. 4KU




    D) Points of Communications
          The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

         1) 1 to Permitted Space Station List

    E) Antenna Facilities
                                                                                                                                                          Special
                                                                                                                   E1 Site              Max              Provisions
         Site           Antenna                 Diameter                                                             evation       Antenna Height        (Refer to
          ID               ID         Units     (meters)       Manufacturer              Model number              (Meters)            (Meters)          Section H)
1                         2.4C          1          2.4               AVL Tech                 2410CK                                   3.5 AGL
            Max Gains(s) :             41.6 dBi @            6.1750 GHz
            Maximum total input power at antenna flange (Watts) =                                  350 .00
            Maximum aggregate output EIRP for all carriers (dBW) =                                  67.04




1                         2 . 4KU       1          2.4               AVL Tech                 2410CK                                   3.5 AGL
            Max Gains(s) :             48.9 dBi C           14.2500 GHz
            Maximum total input power at antenna flange (Watts) =                                  350 .00
            Maximum aggregate output EIRP for all carriers (dBW) =                                 74 .34




    G) Antenna Structure marking and lighting requirements:
                None unless otherwise specified under Special and General Provisions




                                                                 ( page 2 of 4 )         se        s                                      FCC Form 488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                    RADIO STATION AUTHORIZATION

Name: Peak Uplink, Inc                                                                     Call Sign: E160073
Authorization Type: License                                                              File Number: SES—LIC—20160427—00387
Non Common Cartier                  Grant date:    06/20/2016         Expiration Date:   06/20/2031




H) Special and General Provisions
   A)This RADIO STATION             AUTHORIZATION is granted subject to the following special provisions and general
     conditions:
       156 ——— This is granted with the condition that the licensee shall comply with Section 25.277(c) of the Commission‘s
              rules, 47 C.F.R. §25.277(c), regarding submission of Frequency Coordination Reports prior to commencing
              operations at any location. This is also granted subject to Section 25.277(d) and (e) of the Commission‘s rules,
              47 C.F.R. §25.277(d) and (e). Failure to perform successful prior frequency coordination will result in the
              cancellation of your station license herein. Copies of all coordination notices shall be forwarded to the FCC
              Operations Center Office in Columbia, Maryland.



      1900 ——— Applicable to all transmitting frequency bands. Authority is granted to transmit any number of RF carriers with
               the specified parameters on any discrete frequencies within associated band in accordance with the other terms
               and conditions of this authorization, subject to any additional limitations that may be required to avoid
               unacceptable levels of inter—satellite interference.
      2010 ——— This authorization is issued pursuant to the Commission‘s Second Report and Order adopted June 16, 1972 (35
               FCC 2d 844) and Memorandum, Opinion and Order adopted December 21, 1972 (38 FCC 2d 665) in Docket No.
               16495 and is subject to the policies adopted in that proceeding.
      2938 ——— Upon completion of construction, each licensee must file with the Commission a certification including the
               following information: (1) name of the licensee, (2) file number of the application, (3) call sign of the antenna, (4)
               date of the license, (5) certification that the facility as authorized has been completed, (6) certification that each
               antenna facility has been tested and is within 2 dB ofthe pattern specified in Section 25.209, and (7) certification
               that the station is operational (including the date of commencement of service) and will remain operational during
               the license period unless the license is submitted for cancellation.
     3219 ——— All existing transmitting facilities, operations and devices regulated by the Commission must be in compliance
              with the Commission‘s radiofrequency (RF) exposure guidelines, pursuant to Section 1.1307(b)(1) through (b)(3)
               of the Commission‘s rules, or if not in compliance, file an Environmental Assessment (EA) as specified in Section
               1.1311. See 47 CFR § 1.1307 (b) (5).
     5208 ——— The licensee shall take all necessary measures to ensure that the antenna does not create potential exposure of
              humans to radiofrequency radiation in excess of the FCC exposure limits defined in 47 CFR 1.1307(b) and
              1.1310 wherever such exposures might occur. Measures must be taken to ensure compliance with limits for both
              occupational/controlled exposure and for general population/uncontrolled exposure, as defined in these rule
              sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
              Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
              measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fcc.gov/oet/rfsafety) provides information
              on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
              signs and protective equipment for workers.
     5216 ——— All operations shall be on a non—common carrier basis.


    90332 ——— Antenna ID 2.4C operates based on the previously license SES—LIC—20140312—00135.




                                                       ( page 3 of 4 )                                              ¥CC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                  RADIO STATION AUTHORIZATION

Name: Peak Uplink, Inc                                                                 Call Sign: E160073
Authorization Type: License                                                         File Number: SES—L1C—20160427—00387
Non Common Carrier                Grant date:    06/20/2016      Expiration Date:     06/20/2031




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:
              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakings described will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. §303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the governmentof the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission‘s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
              designated frequencies beyond the term of this license, nor in any other manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliancewith environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
               17.4.

              The following condition applies when this authorization permits construction of or modifies the construction
              permit ofa radio station.

              This authorization shall be automatically forfeited if the station is not ready for operation by the required date of
              completion of construction unless an application for modification of authorization to request additional time to
              complete construction is filed by that date, together with a showing that failure to complete construction by the
              required date was due to factors not under control of the grantee.

               Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
               collect annual regulatoryfees from regulatees is contained in Public Law 103—66, "The Omnibus Budget
               Reconciliation Act of 1993." These regulatory fees, which are likelyto change each fiscal year, are used
               to offset costs associated with the Commission‘s enforcement, public service, international and policy and
               rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
               fee rates. Receive only earth stations are exempt from payment of regulatory fees.




                                                      (page 4 of 4 )                                                FCC Form 488



Document Created: 2016-08-02 15:31:53
Document Modified: 2016-08-02 15:31:53