Attachment 20160721121244.pdf

20160721121244.pdf

DECISION submitted by FCC-IB

Grant

2016-07-21

This document pretains to SES-LIC-20160317-00247 for License on a Satellite Earth Station filing.

IBFS_SESLIC2016031700247_1144015

                                                       UNITED STATES OF AMERICA
                                                  FEDERAL COMMUNICATIONS COMMISSION

                                                RADIO STATION AUTHORIZATION

  Name: Spire Global, Inc.                                                                                       Call Sign: E160032
  Authorization Type: License                                                                                File Number: SES—LIC—20160317—00247
  Non Common Carrier                            Grant date:        06/22/2016          Expiration Date:       06/22/2031




 Nature of Service: Earth Exploration Satellite Service
  Class of Station: Fixed Earth Stations

 A) Site Location(s)
                                                                                                                    Elevation                    pecial Provisions
  # Site ID                              Address                                Latitude      Longitude               (Meters)       NAD (Refer to Section H)

 1) cres                  155 Locust Street                                arsaar42.390       92e39t84.7°W                 4.3          83
                           (cres)
                          Hartford, Martford, CT 06114




 Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequentacts and
 treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
 requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
 below for radio communications for the termbeginning June 22, 2016 (3 AM Eastern Standard Time)_and ending June 22,
  2031 (3 AM Eastern Standard Time) . The required date ofcompletion ofconstruction and commencement ofoperation is June
  22, 2017 (3 AM Eastern Standard Time) . Grantee must file with the Commission a certification upon completion of
  construction and commencement ofoperation.


 B) Particulars of Operations

 The General Provision 1010 applies to all receiving frequency bands
 ‘The General Provision 1900 applies to all ransmitting frequencybands
 For the text of these provisions, refer to Section H.
                                                                                    Max     Max EIRP                          Sp
              $                                                                    EIRP      Density                        Provisions
                  requency              Polarization                    Ta/Rx    /Carrier   /CaFrie?      Associated        (Refer to        Modulation/
 #                (MHz)                       Code         Emission Mode          (dBW) (dBWAMKHz) Antenna                  S€¢NON H)          Services
. 1) 402.0000—403.0000                    ®              isxoriD     ry           31.50     as.re   vire1                                    Comand
 2) 402.0000—403.0000                     ®              1sk0rID         x         0.00           0.00     timer                             Telemetry and Tracking and
                                                                                                                                             Digital Data

 C) Frequency Coordination Limits
                                                           Satellite Arc              Elevation             Azimuth          Max EIRP
              r requency Limi
                          Limits
                                                          (Deg, Long.)                (Degrees)             (Degrees)      Density toward
                                                          East      West            East    West          East     West          Horizon             Associated
  #                  (MHz)                               Limit      Limit          Limit    Limit        Limit     Limit    (dBW/AKHz)              Antenna(s)

 1         402.0000—403.0000                                     neso                10.0—20.0            000.0—360.0            as.7sse        vir—1




                                                                         (page 1 of 4)                                                             FCC Form 488


                                                 UNITED STATES OF AMERICA
                                            FEDERAL COMMUNICATIONS COMMISSION

                                           RADIO STATION AUTHORIZATION

  Name: Spire Global, Inc.                                                                      Call Sign: E160032
  Authorization Type: License                                                                File Number: SES—LIC—20160317—00247
  Non Common Carrier                       Grant date:   06/22/2016     Expiration Date:      06/22/2031




 D) Points of Communications
       The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

   1)CTGS to LEMUR Phase 1, NGSO satellite orbiting at or below 43 5km at 51.6° inclination

 E) Antenna Facilities
                                                                                                       si                               Special
                                                                                                            te           Max           Provisions
   Site              Antenna                Diameter                                                 Elevatio®       Antenna Height    (Refer to
       ID               ID         Units      (meters)     Manufacturer            Model number      (Meters)           (Meters)       Section H)
CTGS                   UHF—1         1         1.85      M2 Antenna Systems           401CP14        4.3         10.2 AGL/ 14.5 AMSL

            Max Gains(s) :          11.5 dBi 0           0.4025 GHz          11.5 dBi 0        0.4025 GHz
            Maximum total input power at antenna flange (Watts) =                          100 .00
            Maximum aggregate output EIRP for all carriers (dBW) =                         31.50




 F) Remote Control Point:
 CTGS                  33 Norfolk Street                                                              Call Sign: N/A
                       San Francisco, San Francisco, CA 94103
                       415—356—3400 x307


 G) Antenna Structure marking and lighting requirements:
             None unless otherwise specified under Special and General Provisions


 H) Special and General Provisions
        A)This RADIO STATION               AUTHORIZATION is granted subject to the following special provisions and general
          conditions:
             1010 ——— Applicable to all receiving frequency bands. Emission designator indicates the maximum bandwidth of received
                      signal at associated station(s). Maximum EIRP and maximum EIRP density are not applicable to receive
                      operations.
             1900 ——— Applicable to all transmitting frequency bands. Authority is granted to transmit any number of RF carriers with
                      the specified parameters on any discrete frequencies within associated band in accordance with the other terms
                      and conditions of this authorization, subject to any additional limitations that may be required to avoid
                      unacceptable levels of inter—satellite interference.
            2010 ——— This authorization is issued pursuant to the Commission‘s Second Report and Order adopted June 16, 1972 (35
                     FCC 2d 844) and Memorandum, Opinion and Order adopted December 21, 1972 (38 FCC 2d 665) in Docket No.
                     16495 and is subject to the policies adopted in that proceeding.




                                                            ( page 2 of 4)                                                 FCC Form 488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: Spire Global, Inc.                                                                Call Sign: E160032
Authorization Type: License                                                          File Number: SES—LIC—20160317—00247
Non Common Cartier                 Grant date:    06/22/2016      Expiration Date:     06/22/2031




H) Special and General Provisions
   A)This RADIO STATION AUTHORIZATION is granted subject to the following special provisions and general
      conditions:
     2300 ——— Authority is granted to operate this station by remote control provided that: (1)the parameters of the transmissions
               of this station monitored at the remote control point, and the operational functions sufficient to ensure that the
               operations of this station are in full compliance with the station authorization at all times; (2) upon detection by
               the grantee, or upon notification from the Commission, of a deviation of the operation of this station,
               transmissions shall be immediately suspended until the deviation is corrected, except that transmissions
               concerning the immediate safety oflife or property may be conducted for the duration of such emergency; and (3)
               the grantee shall have available, at all times, the technical personnel necessary to perform the technical servicing
               and maintenance of this station expeditiously. See also Public Notice "The International Bureau Provides
               Guidance Concerning the Relocation of Earth Station Remote Control Points", DA 06—978 (rel. May 4, 2006).
     2916 ——— Transmitter(s) must be turned off during antenna maintenance to ensure compliance with the FCC—specified safety
              guidelines for human exposure to radiofrequency radiation in the region between the antenna feed and the
              reflector. Appropriate measures must also be taken to restrict access to other regions in which the earth station‘s
              power flux density levels exceed the specified guidelines.
      2938 ——— Upon completion of construction, each licensee must file with the Commission a certification including the
               following information: (1) name of the licensee, (2) file number of the application, (3) call sign of the antenna, (4)
               date of the license, (5) certification that the facility as authorized has been completed, (6) certification that each
               antenna facility has been tested and is within 2 dB of the pattern specified in Section 25.209, and (7) certification
               that the station is operational (including the date of commencement of service) and will remain operational during
               the license period unless the license is submitted for cancellation.
      3219 ——— All existing transmitting facilities, operations and devices regulated by the Commission must be in compliance
               with the Commission‘s radiofrequency (RF) exposure guidelines, pursuant to Section 1.1307(b)(1) through (b)(3)
               of the Commission‘s rules, or if not in compliance, file an Environmental Assessment (EA) as specified in Section
               1.1311. See 47 CFR § 1.1307 (b) (5).
      5208 ——— The licensee shall take all necessary measures to ensure that the antenna does not create potential exposure of
               humans to radiofrequency radiation in excess of the FCC exposure limits defined in 47 CFR 1.1307(b) and
               1.1310 wherever such exposures might occur. Measures must be taken to ensure compliance with limits for both
               occupational/controlled exposure and for general population/uncontrolled exposure, as defined in these rule
               sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
               Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
               measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fec.gov/oet/rfsafety) provides information
               on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
               signs and protective equipment for workers.
      5216 ——— All operations shall be on a non—common carrier basis.




                                                      ( page 3 of 4 )                                                FCC Form 488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: Spire Global, Inc.                                                                Call Sign: E160032
Authorization Type: License                                                          File Number: SES—LIC—20160317—00247
Non Common Carrier                 Grant date:   06/22/2016       Expiration Date:    06/22/2031




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:
              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakingsdescribed will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. §303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission‘s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
              designated frequencies beyond the term of this license, nor in anyother manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliancewith environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              17.4.

              The following condition applies when this authorization permits construction of or modifies the construction
              permit of a radio station.

              This authorization shall be automatically forfeited if the station is not ready for operation by the required date of
              completion of construction unless an application for modification ofauthorization to request additional time to
              complete construction is filed by that date, together with a showing that failure to complete construction by the
              required date was due to factors not under control of the grantee.

              Licensees are required to payannual regulatory fees related to this authorization, The requirement to
              collect annual regulatoryfees from regulatees is contained in Public Law 103—66, "The Omnibus Budget
              Reconciliation Act of 1993." These regulatory fees, which are likely to change each fiscal year, are used
              to offset costs associated with the Commission‘s enforcement, public service, international and policy and
              rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
              fee rates. Receive only earth stations are exempt from payment of regulatory fees.




                                                     (page 4 of 4)                                                  FCC Form 488



Document Created: 2016-07-21 12:14:37
Document Modified: 2016-07-21 12:14:37

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC