Attachment 20150806180708.pdf

20150806180708.pdf

DECISION submitted by IB-FCC

Grant

2015-08-06

This document pretains to SES-LIC-20150608-00330 for License on a Satellite Earth Station filing.

IBFS_SESLIC2015060800330_1098785

                                                  UNITED STATES OF AMERICA
                                             FEDERAL COMMUNICATIONS COMMISSION

                                            RADIO STATION AUTHORIZATION

Name: LESEA BROADCASTING CORPORATION                                                                      Call Sign: E150075
Authorization Type: License                                                                             File Number: SES—LIC—20150608—00330
Non Common Carrier                          Grant date:    07/23/2015          Expiration Date:         07/23/2030




Nature of Service: Fixed Satellite Service
Class of Station: Temporary Fixed Earth Station

A) Site Location(s)
                                                                                                              Elevation                         t
#. Site ID                           Address                            Latitude      Longitude               (Meters)      NAD (Refer to Section H)

1) 1                   Teansportnate shreturte                                                                                  mm
                       eneai station
                       vartous,
                       Licensee certifies antenna(s) comply with gain patterns specified in Section 25.209


Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forthin this license, the grantee is authorizedto construct, use and operate the radio facilities described
belowfor radio communications for the term beginning July 23, 2015 (3 AM Eastern Standard Time) and ending July 23,
2030 (3 AM Eastern Standard Time) . The required date ofcompletionofconstruction and commencement ofoperation is July
23, 2016 (3 AM Eastern Standard Time) . Grantee must file with the Commission a certification upon completion of
construction and commencement ofoperation.


B) Particulars of Operations

The General Provision 1010 applies to all receiving frequencybands.
The General Provision 1900 applies to all transmitting frequencybands
For the text ofthese provisions, refer to Section H.
                                                                            Max    Max EIRP                           Special
            r                                                      EIRP   Density                                    Provisions
                requency             Polarization          Tx/Rx /Carrier /Carritt Associated                         ——(RCFT 10— Modulation/
#               (MHz)                   Code      Emission Mode (dBW) (dBWAKH2) Angennga                             SCCHOM H)      Services
1) 14000.0000—24500.0000              K.V        24H0GTF        x          71.80          34.00     1                                Psk   prettan           vipzo   Ap
                                                                                                                                     aupto
21 12700.0000—12200.0000              #.Y        2410G7F        Rx                                  i                                Psx       DIGITAL       VIDEO   AND
                                                                                                                                     AubtO




C) Frequency Coordination Limits

                                                   Satellite Are              Elevation                 Azimuth        Max EIRP
            5              PEHSH                   (Deg. Long.)               (Degrees)              (Degrees)       Density toward
                requency     imits                 East      West           East    West           East      West       Horizon                 Associated
#                  (MHz)                         Limit      Limit          Limit    Limit         Limit      Limit (dBW/AKHz)                   Antenna(s)
1)     11700 .0000—12200 . 0000                   69. 0# 239 . O             05.0—05 .0            102.5—257.5                             1

2)     14000 . 000024500 . 0000                   $9. 0M—139 . O#            05.0—05 .0            102.5—257.5              1.             1




                                                                (page 1 of 4)                                                                  FCC Form 488


                                             UNITED STATES OF AMERICA
                                        FEDERAL COMMUNICATIONS COMMISSION

                                       RADIO STATION AUTHORIZATION

Name: LESEA BROADCASTING CORPORATION                                                             Call Sign: E150075
Authorization Type: License                                                                 File Number: SES—LIC—20150608—00330
Non Common Carrier                     Grant date;:    07/23/2015      Expiration Date:         07/23/2030




D) Points of Communications
  The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

 1) 1 to Permitted Space Station List

E) Antenna Facilities
                                                                                                                                         Special
                                                                                                         Site             Max          Provisions
 Site            Antenna                 Diameter                                                     Elevation       Antenna Height   (Refer to
  ID                ID         Units     (meters)        Manufacturer             Model number         (Meters)          (Meters)      Section H)
                     1           1          2.4         AVL TECHNOLOGIES                 2400                             6.1 AGL
    Max Gains (s) :             47.0 aBi e            11.9500 GHz           48.8 aBi e      14.1250 GHz
    Maximum total input power at antenna flange (Watts) =                                 200.00
    Maximum aggregate output EIRP for all carriers (dBW) =                                 71.80




G) Antenna Structure marking and lighting requirements:
        None unless otherwise specified under Special and General Provisions


H) Special and General Provisions
   A)This RADIO STATION                AUTHORIZATION is granted subject to the following special provisions and general
     conditions:
        1010 ——— Applicable to all receiving frequency bands. Emission designator indicates the maximum bandwidth of received
                signal at associated station(s).       Maximum EIRP and maximum EIRP density are not applicable to receive
                 operations.
        1900 ——— Applicable to all transmitting frequency bands. Authority is granted to transmit any number of RF carriers with
                 the specified parameters on any discrete frequencies within associated band in accordance with the other terms
                 and conditions of this authorization, subject to any additional limitations that may be required to avoid
                 unacceptable levels of inter—satellite interference.
        2010 ——— This authorization is issued pursuant to the Commission‘s Second Report and Order adopted June 16, 1972 (35
                 FCC 2d 844) and Memorandum, Opinion and Order adopted December 21, 1972 (38 FCC 2d 665) in Docket No.
                 16495 and is subject to the policies adopted in that proceeding.
        2916 ——— Transmitter(s) must be turned off during antenna maintenance to ensure compliance with the FCC—specified safety
                 guidelines for human exposure to radiofrequency radiation in the region between the antenna feed and the
                 reflector. Appropriate measures must also be taken to restrict access to other regions in which the earth station‘s
                 power flux density levels exceed the specified guidelines.




                                                          ( page 2 of 4 )                                                   FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: LESEA BROADCASTING CORPORATION                                                    Call Sign: E150075
Authorization Type: License                                                          File Number: SES—LIC—20150608—00330
Non Common Carrier                Grant date:    07/23/2015       Expiration Date:    07/23/2030




H) Special and General Provisions
   A)This RADIO STATION            AUTHORIZATION is granted subject to the following special provisions and general
     conditions:
     2938 ——— Upon completion of construction, each licensee must file with the Commission a certification including the
              following information: (1) name of the licensee, (2) file number of the application, (3) call sign of the antenna, (4)
              date of the license, (5) certification that the facility as authorized has been completed, (6) certification that each
              antenna facility has been tested and is within 2 dB of the pattern specified in Section 25.209, and (7) certification
              that the station is operational (including the date of commencement of service) and will remain operational during
              the license period unless the license is submitted for cancellation.
     3219 ——— All existing transmitting facilities, operations and devices regulated by the Commission must be in compliance
              with the Commission‘s radiofrequency (RF) exposure guidelines, pursuant to Section 1.1307(b)(1) through (b)(3)
              of the Commission‘s rules, or if not in compliance, file an Environmental Assessment (EA) as specified in Section
              1.1311. See 47 CFR § 1.1307 (b) (5).
     5208 ——— The licensee shall take all necessary measures to ensure that the antenna does not create potential exposure of
              humans to radiofrequency radiation in excess of the FCC exposure limits defined in 47 CFR 1.1307(b) and
              1.1310 wherever such exposures might occur. Measures must be taken to ensure compliance with limits for both
              occupational/controlled exposure and for general population/uncontrolled exposure, as defined in these rule
              sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
              Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
              measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fec.gov/oet/rfsafety) provides information
              on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
              signs and protective equipment for workers.
     5216 ——— All operations shall be on a non—common carrier basis.




                                                     ( page 3 of 4)                                                 FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: LESEA BROADCASTING CORPORATION                                                    Call Sign: E150075
Authorization Type: License                                                          File Number: SES—LIC—20150608—00330
Non Common Carrier                Grant date:—   07/23/2015       Expiration Date:   07/23/2030




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:

              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakings described will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission mayrequire underthe provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. §303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, companyor corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission‘s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station norany right in the use ofthe
              designated frequencies beyond the term ofthis license, norin any other manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              17.4.

              The following condition applies when this authorization permits construction of or modifies the construction
              permit of a radio station.

              This authorization shall be automatically forfeited if the station is not ready for operation by the required date of
              completion of construction unless an application for modification of authorization to request additional time to
              complete construction is filed by that date, togetherwith a showing that failure to complete construction bythe
              required date was due to factors not under control of thegrantee.

              Licensees are required to pay annual regulatoryfees related to this authorization. The requirement to
              collect annual regulatoryfees from regulatees is contained in Public Law103—66, "The Omnibus Budget
              Reconciliation Act of 1993," These regulatory fees, which are likely to change each fiscal year, are used
              to offset costs associated with the Commission‘s enforcement, public service, international and policy and
              rulemaking activities. The Commission issues a Report and Order each ycnr, setting the newregulatory
              fee rates, Receive only earth stations are exempt from payment of regulator




                                                     (page 4 of4)                                                   FCC Form 488



Document Created: 2015-08-06 18:07:24
Document Modified: 2015-08-06 18:07:24

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC