Attachment SESLIC2015032300176.

SESLIC2015032300176.

DECISION submitted by FCC

LICENSE GRANT

0000-00-00

This document pretains to SES-LIC-20150323-00176 for License on a Satellite Earth Station filing.

IBFS_SESLIC2015032300176_1122183

                                                      UNITED STATES OF AMERICA
                                                 FEDERAL COMMUNICATIONS COMMISSION

                                                RADIO STATION AUTHORIZATION

    Name: University of Alaska Fairbanks                                                                          Call Sign: E140023
    Authorization Type: License                                                                            File Number: SES—LIC—20
 Non Common Carrier                            Grant date:       09/02/2015        Expiration Date:         09/02/2030




Nature of Service: Earth Exploration Satellite Service
Class of Station: Fixed Earth Stations

A) Site Location(s)
                                                                                                                     Elevation          Special Provisions
# Site ID                               Address                             Latitude          Longitude               (Meters)     NAD (Refer to Section H)

1) UAF ASF GS            1625 Richardson Hwy                             64°47‘37.0"N      147°32‘10.0"W               143 .8       83
                         North Pole,        North Star,       AK
                         99705

                         Licensee certifies antenna(s)                   comply with gain patterns specified in Section 25.209




Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
below for radio communications for the term beginning September 2, 2015 (3 AM Eastern Standard Time) and ending
September 2, 2030 (3 AM Eastern Standard Time) . The required date of completion of construction and commencement of
operation is September 2, 2016 (3 AM Eastern Standard Time) . Grantee must file with the Commission a certification upon
completion ofconstruction and commencement ofoperation.


B) Particulars of Operations

The General Provision 1010 applies to all receiving frequency bands.
The General Provision 1900 applies to all transmitting frequency bands.
For the text of these provisions, refer to Section H.
                                                                               Max      Max EIRP                            Special
                                                                              EIRP       Density                          Provisions
            Frequency                 Polarization                  Tx/Rx    /Carrier    /Carrier aAsgociated              (Re.fer 10    Modulation/
#              (MHz)                      Code          Emission Mode         (dBW) (dBW/4KkH2) Angenna                  Section H)        Services
1) s0o72.5000—8371.2000                  H, V, L, R 100KG7D          Rx                                  7 .3m                           Digital Data Carrier

2) 2042.0000—2052.0000                   H,V, L, R 100KG7D           Tx       53.90           40 .00     7 .3m                           Digital Data Carrier

3) s072.5000—8371.2000                   H, V, L, R 100KG7D          Rx                                  9. 1m                           Digital Data Carrier

4) 2042.0000—2052.0000                   H,V, L, R 100KG7D           Tx       24 .90          11.00      9 . 1m                          Digital Data Carrier



C) Frequency Coordination Limits
                                                         Satellite Arc            Elevation     _         Azimuth          Max EIRP
                        22.                               (Deg. Long.)           (Degrees)                (Degrees) Density toward
            Frequency Limits                             East     West         East    West             East    West    Horizon                 Associated
#                (MHz)                                  Limit     Limit       Limit    Limit           Limit    Limit (dBW/4kHz)                Antenna(s)
1)       8072.5000—8371.2000                                 NGSO               05.0—05. 0              o00.0—000 .0                        7 .3m


                                                                     ( page 1 of 4)                                                           FCC Form 488


                                                    UNITED STATES OF AMERICA
                                               FEDERAL COMMUNICATIONS COMMISSION

                                              RADIO STATION AUTHORIZATION

  Name: University of Alaska Fairbanks                                                                   Call Sign: E140023
  Authorization Type: License                                                                         File Number: SES—LIC—20150323—00176
  Non Common Carrier                          Grant date:    09/02/2015          Expiration Date:      09/02/2030




  C) Frequency Coordination Limits

                                                     Satellite Arc             Elevation              Azimuth           Max EIRP
                r           Limi                     (Deg. Long.)             (Degrees)               (Degrees) Density toward
                    requency Limits                 East     West           East    West            East    West    Horizon             Associated
  #                    (MHz)                       Limit     Limit         Limit    Limit          Limit    Limit (dBW/4kHz)            Antenna(s)
  2)          2042.0000—2052.0000                          NGSO              05.0—05 .0             000.0—000 .0               6   7 .3m

  3)          8072.5000—8371.2000                          NGSO              05.0—05.0              000.0—000 .0                   9 . 1m

 4)           2042.0000—2052.0000                          NGSO              05.0—05.0              000.0—000 .0          —24 .6   9. 1m




 D) Points of Communications
        The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

      1)UAF ASF GS to Worldview—1 ($2129) NGSO satellite (U.S.—licensed)
   2) UAF ASF GS to Worldview—2 ($2129) NGSO satellite (U.S.—licensed)
   3) UAF ASF GS to Worldview—3 ($2129) NGSO satellite (U.S.—licensed)
   4) UAF ASF GS to GeoEye 1 ($2348) NGSO satellite (U.S.—licensed)
   5) UAF ASF GS to GeoEye 2 (S2348) NGSO satellite (U.S.—licensed)


 E) Antenna Facilities
                                                                                                                    .                                 Special
                                                                                                                   Site             Max              Provisions
       Site             Antenna                Diameter                                                         Elevation      Antenna Height         (Refer to
        ID                ID          Units     (meters)          Manufacturer             Model number         (Meters)          (Meters)           Section H)
UAF ASF GS                7 .3m         1         7.3                 ViaSat                  7.3 Meter         143 .8      7.3 AGL/ 151.1 AMSL
          Max Gains(s) :               53.0 dBi @            8.2000 GHz              41.0 dBi @         2.0470 GHz
          Maximum total input power at antenna flange (Watts) =                                     50 .00
          Maximum aggregate output EIRP for all carriers (dBW) =                                    57.90




UAF ASF GS                9 .1m         1         9.1                ViaSat                   9.1 Meter         143 .8      9.1 AGL/ 152.9 AMSL
          Max Gains(s) :               55.0 aBi @            8.2000 GHz              42.6 daBi e        2.0470 GHz
          Maximum total input power at antenna flange (Watts) =                                     50 .00
          Maximum aggregate output EIRP for all carriers (dBW) =                                    59.60




 G) Antenna Structure marking and lighting requirements:
              None unless otherwise specified under Special and General Provisions




                                                                   ( page 2 of 4 )                                                   FCC Form 488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                    RADIO STATION AUTHORIZATION
Name: University of Alaska Fairbanks                                                      Call Sign: E140023
Authorization Type: License                                                             File Number: SES—LIC—20150323—00176
Non Common Carrier                 Grant date:    09/02/2015         Expiration Date:   09/02/2030




H) Special and General Provisions
   A)This RADIO STATION             AUTHORIZATION is granted subject to the following special provisions and general
      conditions:
     1010 ——— Applicable to all receiving frequency bands. Emission designator indicates the maximum bandwidth of received
              signal at associated station(s). Maximum EIRP and maximum EIRP density are not applicable to receive
              operations.
     1900 ——— Applicable to all transmitting frequency bands. Authority is granted to transmit any number of RF carriers with
              the specified parameters on any discrete frequencies within associated band in accordance with the other terms
              and conditions of this authorization, subject to any additional limitations that may be required to avoid
              unacceptable levels of inter—satellite interference.
     2010 ——— This authorization is issued pursuant to the Commission‘s Second Report and Order adopted June 16, 1972 (35
              FCC 2d §$44) and Memorandum, Opinion and Order adopted December 21, 1972 (38 FCC 2d 665) in Docket No.
              16495 and is subject to the policies adopted in that proceeding.
     2916 ——— Transmitter(s) must be turned off during antenna maintenance to ensure compliance with the FCC—specified safety
              guidelines for human exposure to radiofrequency radiation in the region between the antenna feed and the
              reflector. Appropriate measures must also be taken to restrict access to other regions in which the earth station‘s
             power flux density levels exceed the specified guidelines.
     2938 ——— Upon completion of construction, each licensee must file with the Commission a certification including the
              following information: (1) name of the licensee, (2) file number of the application, (3) call sign of the antenna, (4)
              date of the license, (5) certification that the facility as authorized has been completed, (6) certification that each
              antenna facility has been tested and is within 2 dB of the pattern specified in Section 25.209, and (7) certification
             that the station is operational (including the date of commencement of service) and will remain operational during
             the license period unless the license is submitted for cancellation.
     3219 ——— All existing transmitting facilities, operations and devices regulated by the Commission must be in compliance
             with the Commission‘s radiofrequency (RF) exposure guidelines, pursuant to Section 1.1307(b)(1) through (b)(3)
             of the Commission‘s rules, or if not in compliance, file an Environmental Assessment (EA) as specified in Section
             1.1311. See 47 CFR § 1.1307 (b) (5).
     5208 ——— The licensee shall take all necessary measures to ensure that the antenna does not create potential exposure of
              humans to radiofrequency radiation in excess of the FCC exposure limits defined in 47 CFR 1.1307(b) and
              1.1310 wherever such exposures might occur. Measures must be taken to ensure compliance with limits for both
             occupational/controlled exposure and for general population/uncontrolled exposure, as defined in these rule
             sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
             Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
             measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fec.gov/oet/rfsafety) provides information
             on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
             signs and protective equipment for workers.
     5216 ——— All operations shall be on a non—common carrier basis.


     9995 ——— Operation of this earth station shall not constrain the deployment of the Television Broadcast Auxiliary Service,
             the Cable Television Relay Service, or the Local Television Transmission Service.




                                                      ( page 3 of 4)                                                FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: University of Alaska Fairbanks                                                    Call Sign: E140023
Authorization Type: License                                                          File Number: SES—LIC—20150323—00176
Non Common Carrier                Grant date:    09/02/2015       Expiration Date:   09/02/2030




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:

              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakings described will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. § 303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission‘s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
              designated frequencies beyond the term of this license, nor in any other manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              17.4.

              The following condition applies when this authorization permits construction of or modifies the construction
              permit of a radio station.                                                                           f

             This authorization shall be automatically forfeited if the station is not ready for operation by the required date of
             completion of construction unless an application for modification of authorization to request additional time to
             complete construction is filed by that date, together with a showing that failure to complete construction by the
             required date was due to factors not under control of the grantee.

              Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
              collect annual regulatory fees from regulatees is contained in Public Law 103—66, "The Omnibus Budget
              Reconciliation Act of 1993." These regulatory fees, which are likely to change each fiscal year, are used
              to offset costs associated with the Commission‘s enforcement, public service, international and policy and
              rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
              fee rates. Receive only earth stations are exempt from payment of regulatory fees.




                                                     ( page 4 of 4 )                                               FCC Form 488



Document Created: 2016-01-12 16:15:09
Document Modified: 2016-01-12 16:15:09

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC