Attachment Exhibit B

This document pretains to SES-AMD-20091118-01473 for Amended Filing on a Satellite Earth Station filing.

IBFS_SESAMD2009111801473_781828

                                                                                                                                                                               EXHIBIT B

FCC 312                                                                                                                                                              Page 1: Location
Schedule B
                                                        FEDERAL COMMUNICATIONS COMMISSION
                               APPLICATION FOR SATELLITE SPACE AND EARTH STATION AUTHORIZATIONS
                                                                 Technical and Operational Description)
                                                                         (Place an "X" in one of the blocks below)

D License of New Station    DRegistration of new Domestic D Amendment to a Pending Application                Modification of License/Registration D Notification of Minor Modification
                                     Receive—Only Station

B1. Location of Earth Station Site. Iftemporary—fixed, mobile, or VSAT remote.facility, specify area of operation and point of contact. If VSAT hub station, give its location
                                      For VSAT networks attach individual Schedule B, Page 1 sheets for each hub station and each remote station. Individually provide the
                                      Location, Points of Communications, and Destination Points for each hub and remote station.

                                                            NO CHANGE TO INFORMATION IN CURRENT LICENSE



B2. Points of Communications:     List the names and orbit locations of all satellites with which this earth station will communicate. The entry "ALSAT" is sufficient to identify
                                  the names and locations of all satellite facilities licensed by the U.S. All non—U.S. licensed satellites must be listed individually.           *
Satellite Name and Orbit Location                      I Satellite Name and Orbit Location                               | Satellite Name and Orbit Location

                                                            NO CHANGE TO INFORMATION IN CURRENT LICENSE




B3. Destination points for communications using non—U.S. licensed satellites. For each non—U.$S. licensed satellite facility identified in section B2 above, specify the destination
point(s) (countries) where the services will be provided by this earth station via each non—U.S. license satellite system. Use additional sheets as needed.
Satellite Name        °                     I List of Destination Points

                                         NOT APPLICABLE/ NO CHANGE TO INFORMATION IN CURRENT LICENSE




                                                                                                                                                               ‘_FCC 312, Schedule B — Page 1
                                                                                                                                                                            February, 1998


                                                                                                                                                                                                                       EXHIBIT B

                                                                                                          .                                                                                              Page 2: Antennas
                                                        FEDERAL COMMUNICATIONS COMMISSION
                                           APPLICATION FOR SATELLITE SPACE AND EARTH STATION AUTHORIZATIONS
                                                  FCC Form 312 — Schedule B: (Technical and Operational Description)
B4. Earth Station Antenna Facilities: Use additional pages as needed.                                                             ‘
      (a) Site ID*                                (b)                              (c)                      (d) Manufacturer                    (e) Model                           8                         (g) Antenna Gain
                                             Antenna ID**                       Quantity                                                                                       Antenna Size               Transmit and/or Receive
                                                                                                                                                                                 (meters)                (       dBi at____GHz)


                                                                           NO CHANGE TO INFORMATION IN CURRENT LICENSE




            B5. Antenna Helghts and Maximum Power Limits: (The corresponding Antenna ID in tables B4 and B5 applies to the same antenna)
                                                                                Maximum Antenna Height                     (e) Building          (£) Maximum               (g) Total Input
                        (a)                 (b) Antenna Structure           (c) Above           (d) Above                 Height Above          Antenna Height                Power at              (h) Total EIRP
                     Antenna                   Registration No.           Ground Level       Mean Sea Level®              Ground Level          Above Rooftop              antenna flange           for all carriers
                       ID**                                                  (meters)            (meters)                  (meters)***            (meters)***                  (Watts)                  (dBW)                    _


                                                                            NO CHANGE TO INFORMATION IN CURRENT LICENSE


            Notes:    |       *     If this is an application for a VSAT network, identify the site (Item B1b, Schedule B, Page 1) where each antenna is located. Also include this Site—ID on Schedule B, Page 5.
                            dok
                                    Identify each antenna in VSAT network or multi—antenna station with a unique identifier, such as HUB, REMOTEI Al, A2, 10M, 12M, 7M, etc. Use this same antenna ID
                                    throughout tables B4, B5, B6, and B7 when referring to the same antenna.
                          sestole   Attach sketch of site or exemption, See 47 CFR Part 17.




                                                                                                                                                                                                     FCC 312, Schedule B — Page 2
                                                                                                                                                                                                                  February, 1998


                                                                                                                                                                                                                  EXHLBIT B

                                                                                                                                                                                             Page 3: Coordination
                                                              FEDERAL COMMUNICATIONS COMMISSION
                                APPLICATION FOR SATELLITE SPACE AND EARTH STATION AUTHORIZATIONS
                                                   FCC Form 312 — Schedule B: (Technical and Operational Description)
B6. Frequency Coordination Limits: Use additional pages as needed.
#         (a)                   (b)                       (c) Range of            (d) Range of        _     (€) Antenna            (£) Antenna           (g) Earth Station      (h) Earth Station        (i) Maximum EIRP
      Antenna ID*         Frequency Limits                Satellite Arc           Satellite Arc           Elevation Angle        Elevation Angle          Azimuth Angle          Azimuth Angle           Density toward the
                               (MHz)                    Eastern Limit**         Western Limit**            Eastern Limit          Western Limit            Eastern Limit         Western Limit          Horizon (dBW/A4kHz)

1)                                                                  NO CHANGE TO INFORMATION IN CURRENT LICENSE
2)                                                                                                                                                                                                         2.
3)    AK—5          | 14000—14500                   | 40.0w.L               | 133.0W.L               [ 21                    | 25.4                  | 111.7                 | 244.1                [ 14
4)                                                                  NO CHANGE TO INFORMATION IN CURRENT LICENSE
5)                                                        |                                   |
6)    AK—5          | 11700—12200                   | 40.0Ww.L              | 133.0W.L               | 28.9                  | 25.4                  [ 119.6                 | 244.1                |
7)                                   —                               NO CHANGE TO INFORMATION IN CURRENT LICENSE
           Notes:    *   Provide the ANTENNA—ID from table B4 to identify the antenna to which each frequency band and orbital arc range is associated.
                    **   If operating with geostationary satellites, give the orbital are limits and the associated elevation and azimuth angles. If operating with non—geostationary satellites,
                         give the notation "NON—GEO" for the satellite are and give the minimum operational elevation angle and the maximum azimuth angle range.




                                                                                                                                                                                                FCC 312, Schedule B — Page 3
                                                                                                                                                                                                                February, 1998


                                                                                                                                                                                                            EXHIBIT B

                                                                 ,           8    .                                                                                                          Page 4: Particulars
                                                      FEDERAL COMMUNICATIONS COMMISSION                                                                                                              >
                                          APPLICATION FOR SATELLITE SPACE AND EARTH STATION AUTHORIZATIONS
                                                           FCC Form 312 — Schedule B: (Technical and Operational Description)
B7. Particulars of Operation (Full particulars are required for each r.f. carrier); Use additional pages as needed.
      (a)                              (b)   >                 (c)       (d) Antenna            (e)           (£) Maximum        (g) Maximum                   (b) Description of Modulation and Services
  Antenna ID*                   Frequency Limits               T/R       Polarization        Emission            EIRP per        EIRP Density
                                      (MHz)                   Mode        (H,V,L,R)         Designator       Carrier (dBW)        per Carrier
                                    ~                           l                                                                (dBW/4kHz)

                                                                          NO CHANGE TO INFORMATION IN CURRENT LICENSE _


Notes:    *     Provide the ANTENNA—ID from table B4 to identify the antenna to which each frequency band and emission is associated. For VSAT networks, include frequencies and emissions for all HUB and
                REMOTE units.
         **     Indicate whether the earth station transmits or receives in each frequency band.

                                                                                                                                                                                               Page 5: Questions
                                                      FEDERAL COMMUNICATIONS COMMISSION
                                          APPLICATION FOR SATELLITE SPACE AND EARTHSTATION AUTHORIZATIONS
                                                 FCC Form 312 — Schedule B: (Technical and Operational Description)
If VSAT Network, provide the SITE—ID (Item B1b) of the station that B8—B13 are in response to (HUB, REMO"FEI, etc.):


B3. If the proposed antenna(s) operate in the Fixed Satellite Service (FSS) with geostationary satellites, do(es) the proposed antenna(s)
     comply with the antenna gain patterns specified in Section 25.209(a) and (b) as demonstrated by the manufacturer‘s qualification                           IXI YES                    D NO
     measurements? If NO, provide as an exhibit, a technical analysis showing compliance with two—degree spacing policy.
B9. If the proposed antenna(s) do not operate in the Fixed Satellite Service (FSS), or if they operate in the Fixed Satellite Service
  . (FSS) with non—geostationary satellites, do(es) the proposed antenna(s) comply with the antenna gain patterns specified in                                  D YES                      I:l NO
    Section 25.209(a2) and (b) as demonstrated by the manufacturer‘s qualification measurement?
B10. Is the facility operated by remote control? If YES, provide the location and telephone number of the control point.
                                                                                                                                                                [_] YES                          NO
          Remote Control Point Location:
              B1Oa. Street Address

              B1Q0b. City                                                     B10c. County                                        B10.d. State/Country                B1Qe. Zip Code

              B10f. Telephone Number                                                                     B10g. Cali Sign of Control Station (if appropriate)


B11. Is frequency coordination required? If YES, attach a frequency coordination report as an exhibit.
                                                                                                                                                                [] yEs                           NO
                                                                                                                                                                                            FCC 312, Schedule B — Page 4
                                                                                                                                                                                                        February, 1998


                                                                                                                             EXHIBIT B
B12. Is coordination with another country required? If YES, attach the name of the country(ies)
     and plot of coordination contours as an exhibit.                                                 |:| YES       NO

B13. FAA Notification — (See 47 CFT Part 17and 47 CFT Part 25.113(c))                             .
     Where FAA notification is required, have you attached a copy of a completed FCC Form 854 [_] YES               NO
     and/or the FAA‘s study regarding the potential hazard of the structure to aviation?
     FAILURE TO COMPLY WITH 47 CFT PARTS 17 AND 25 WILL RESULT IN THE RETURN OF THIS APPLICATION




                                                                                                                FCC 312, Schedule B — Page 5
                                                                                                                          February, 1998



Document Created: 2019-05-29 09:31:05
Document Modified: 2019-05-29 09:31:05

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC