Attachment letter

letter

LETTER submitted by IB,FCC

letter

2009-05-01

This document pretains to SAT-MOD-20080718-00144 for Modification on a Satellite Space Stations filing.

IBFS_SATMOD2008071800144_710536

                                           Federal Communications Commission
                                                     Washington, DC 20554


International Bureau




                                                          May 1, 2009
              John P. Janka
              Latham & Watkins LLP
              555 Eleventh Street, NW
              Suite 1000
              Washington, DC 2004—1304

                                                        Re: ViaSat, Inc., Call Sign: S2737
                                                        IBFS File Nos. SAT—LOA—20070314—00051,
                                                        SAT—MOD—20080718—00144, and
                                                        SAT—AMD—20081203—00220

              Dear Mr. Janka:

                      This letter refers to ViaSat, Inc.‘s (ViaSat‘s) March 17, 2008 filing to demonstrate
              compliance with its critical design review (CDR) milestone for the above referenced space station
              authorization. We find that the submission fails to show that ViaSat has satisfied this milestone
              and request additional information.

                        Pursuant to its space station authorization, ViaSat was required to provide evidence that it
              had completed the CDR milestone for its VIASAT—KA1 satellite by July 18, 2009.‘ In a letter
              dated March 17, 2009, ViaSat represented that it has satisfied this milestone. ViaSat‘s supporting
              documentation included a certification from ViaSat‘s Director of Regulatory Affairs, and a
              summary of meeting minutes from a CDR meeting between representatives of ViaSat and its
              satellite manufacturer.

                       In the Space Station Licensing Reform Order, the Commission adopted the CDR
              milestone to assist in determining whether licensees were taking timely, concrete steps toward
              system implementation." The Commission emphasized that the burden of proof for this showing
              is on the licensee." In the Order, the Commission stated that evidence demonstrating compliance
              with this milestone may include: (1) evidence of a large payment made concurrent with the CDR;
              (2) affidavits from an independent manufacturer certifying completion; and (3) evidence that the
              licensee has ordered all the long lead items needed to begin physical construction of the
              spacecraft." Subsequently, the International Bureau stated that, upon request, authorized entities
              should be prepared to submit: (1) the documentation package prepared for the payload subsystem
              CDR and the resulting CDR report and Action Items list; (2) evidence of payments made; and (3)



              ‘ ViaSat, Inc. IBFS File No. SAT—LOA—20070314—00051 (granted with conditions on July 18, 2007).
              > Amendment of the Commission‘s Space Station Licensing Rules and Policies, First Report and Order
              and Further Notice ofProposed Rulemaking in IB Docket No. 02—34, and First Report and Order in IB
              Docket No. 02—54, 18 FCC Red 10760, 10833 (2003) (First Space Station Licensing Reform Order).
              * First Space Station Licensing Reform Order, 18 ECC Red at 10834.
              * First Space Station Licensing Reform Order, 18 FCC Red at 10833.


amendments to the manufacturing contract, if any, since the contract was submitted to the
Commission."


        The certification from ViaSat‘s Director of Regulatory Affairs and the copy of meeting
minutes do not demonstrate compliance with the CDR milestone requirement. Accordingly,
please submit the following: the documentation package prepared for the spacecraft CDR
including, but not limited to, the communications payload subsystem CDR and resulting CDR
report and Action items list (on CD—ROM, if possible); evidence of payments made up to the date
of CDR, either through copies of cancelled checks or a letter signed by an authorized individual
certifying the amount and date of each payment; and any revisions or amendments to the satellite
manufacturing contract entered into on July 14, 2008.

        Please submit your response to the Commission‘s Secretary on or before the July 18,
2009 CDR milestone date set forth in ViaSat‘s space station authorization, with a courtesy copy
to Alyssa Roberts of my staff: Alyssa.Roberts@fec.gov.




                                                    Sincerely,
                                                  Hu_—————~=
                                                   Robert G. Nelson
                                                   Chief, Satellite Division
                                                   International Bureau




* Public Notice, International Bureau Provides Guidance Concerning the Critical Design Review Milestone
Requirement, 19 FCC Red 5362 (March 25, 2004).



Document Created: 2019-04-13 08:52:34
Document Modified: 2019-04-13 08:52:34

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC