By Hand Delivery                                               HECE'VED

Ms. Marlene H. Dortch
Secretary                                                        JAN — 9 2005
Federal Communications Commission                          FedeadConmuncatens Canmiss
445 Twelfth Street, Southiwest, TW—A325                           fls ol Secntoy         9
Washington, D.C. 20554
        RE:——     New 1CO Satellite Services G.P.
                  IBFS No. SAT—MOD—20050110—00004

Dear Ms. Dortch:

        Pursuant to Sections 25.164 and 25.165 of the Commission‘s rules,! New ICO
Satellte Services G.P. ("ICO®) submits a certification (attached hereto as attachment 1)
to supplement previouslysubmitted documentation that ICO has begun physical
construction of ts geostationary satellte, consistent with the bond requirement set forth
in ICO‘s authorization for provision of 2 GHz mobile satellite service (°MSS") in the
United States."
        Please direct any questions regarding this submission to the undersigned.
                                        Respectfully submitted,
                                          Pngres t
                                        SuzaniHutchings Maltoy
                                        Senior Regulatory Counsel
Enclosure

ce:     Cassandra Thomes
        Karl Kensinger
        Bob Nelson


1 i7 orn spasien, tes.
* See ICO Satlite Servces, G.P, 20 FCC Red 9797,$10 (1B 2005). Althoush the milestoe schedule
requied by the Commission does not specifcally mandate commencement ofconstructon, IC.ars connectest. NW
submiting theatached certiieationin orderto reduce the amount ofthe bond required by the Sueato
                                                                                         Wasnngn, 00 20008
                                                                                        2o2 3304008 ptore
                                                                                        es 33000 fwx
                                                                                        inss unsm


coRaAL
20 December 2005
Bob Day
Senior Vice President, Space Systems
100 Satelite Services, G.P.
222 North Sepulveds, Suite 1770
El Secundo, Califomia 90243
Dear Mr. Day:
Pursuant to our Satelite manufacturing contract, as executed on Tenuary 10. 2005 (the
"Contract"), Space Systems/Loral,Inc. is submiting this decleration for the 1CO satelite
for 2—GHz mobile communications. By this letter, SS/L hereby certifies that the attached
Loralaricle detailing specific progress on the physical construction of the 1CO satelite
was originally posted on the itemal Loral website on approximately August 15, 200.
in accordance with Section 1.16 of the rulesothe Federal Communications Commission,
47 C.FR. Section 1.16, 1. the undersigned. acting on behalf of Space Systems/Loral, Inc.
hereby declare under penalty of perjury thatto the best of my information and belief, the
foregoing is trie and correct


Executed on 20 December 2005


Sincerely,
SPACE SYSTEMS/LORAL, NC


  Mihh
Christopher E. Hocber
Senior VicePresident
ProgramManagement & Systems Engineering


1CO Central Cylinder Delivered Ahead of Schedule
08/15105, Marketing
"The lower centralcylinder for the
1CO program, fabricated at
SS/T‘s Composite Manufacturing
Center located in Building 48,
was delivered with zero defects
to the Structure Fabrication and
Assembly section in Building 8
on August 11, a day ahead of the
aggressive schedule created to
support this important program.
Typically, the central eylinder is
completed early in te fabrication
of an SS spacecraft, but the
completion of the 1CO central
eylinder occurred approximately two months after long—lead funding was spproved.
which represents significant improvement of spproximately four months compared with
previous similar programs.
Fabricated as a co—cured compositesandwich structure incorporating lightweight
aluminum, honeycomb core ind unidiretional, ltrs—high modulus, graphite fber
faceskin materils, the lower central cylinder is the largest composite component required
by the main body structure measuring approximately 142" in length and 50 in diameter.
"The bus structure is so large that an upper extension eylinder, delivered July 14, will be
utlized in conjunction with the lower cylinder to add an additional 38" length (height) to
the bus structure. Other composite hardware currently fabricated for the ICO main body
stricture includes numerous flat composite panels,struts, and doublers
The completion of his important milestone demonstrtesthe Composite Manufacturing
Center s commitment to working with Design Engineering in a collaborative relationship
to reduce lead times required during program start up



Document Created: 2006-01-12 12:40:34
Document Modified: 2006-01-12 12:40:34

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC