Attachment Attach B-Reg. Matrix

This document pretains to SAT-LOA-20190807-00072 for Application to Launch and Operate on a Satellite Space Stations filing.

IBFS_SATLOA2019080700072_1833539

Attachment B – Regulatory Compliance Matrix
       Reference              Reference Location                         Topic / Reason for (n/a)
                         FCC Form 312, Schedule-S,
25.114(a)(1)             Attachment C                     See generally application materials
                         Schedule-S, Narrative,
25.114(a)(2)             Attachment C – Section 4         NGSO constellation
25.114(a)(3)             n/a                              Application filed pursuant to two-step procedure
25.114(b)                Form 312                         Waiver required by 47 U.S.C. § 304
25.114(c)(1)             Schedule-S, Form 312             Applicant information
25.114(c)(2)             Schedule-S, Form 312             Info for correspondence person
25.114(c)(3)             Schedule-S                       Type of authorization
                         Schedule-S, Attachment C –
25.114(c)(4)(i)          Section 6                        Channel frequency, bandwidth, and polarization
25.114(c)(4)(ii)         Schedule-S                       Maximum EIRP and EIRP density of TX beams
25.114(c)(4)(v)          Schedule-S                       RX beam: G/T, SFD
25.114(c)(4)(vi)(A)      n/a                              GSO: antenna gain contours
                         Schedule-S, Attachment C –
25.114(c)(4)(vi)(B)      Section 14                       NGSO: antenna gain contours
25.114(c)(4)(vi)(C)      n/a                              Shapeable beams: antenna gain contours
25.114(c)(4)(vi)(D)      Attachment C – Section 14        Steerable, non-shapeable beams
25.114(c)(4)(vii)(A-C)   n/a                              GSO: large number of spot beams
25.114(c)(5)(i-v)        n/a                              GSO: orbital parameters
                         Schedule-S, Attachment C –
25.114(c)(6)(i-ix)       Section 4                        NGSO: orbital parameters
                         Schedule-S, Attachment C –
25.114(c)(7)             Section 3                        Frequency bands, types of service, and coverage areas
25.114(c)(8)             Schedule-S, 47 C.F.R. § 25.208   TX beams: PFD
25.114(c)(10)            Schedule-S                       Operational lifetime
25.114(c)(11)            Schedule-S                       Common carrier status
25.114(c)(13)            n/a                              17/24 GHz BSS polarization isolation
                         Narrative, Attachment C –
25.114(d)(1)             Section 2                        Overall description
25.114(d)(6)             Narrative                        Public interest
25.114(d)(7)             n/a                              Interference analysis
25.114(d)(8)             n/a                              L-Band MSS
25.114(d)(9)             n/a                              MSS: multiple satellites
25.114(d)(10)            n/a                              L/S-Band MSS
25.114(d)(11)            n/a                              DBS
25.114(d)(12)            n/a                              NGSO FSS, 47 C.F.R. § 25.146
25.114(d)(13)(i-ii)      n/a                              DBS
                         Attachment C – Section 17,
25.114(d)(14)(i-v)       Attachment D – Orbital Debris    Orbital debris
25.114(d)(15)(i-v)       n/a                              17/24 GHZ BSS
25.114(d)(16)            n/a                              17/24 GHZ BSS

                                                      1


25.114(d)(17)     n/a                              17/24 GHZ BSS
25.114(d)(18)     n/a                              17/24 GHZ BSS




      Reference         Reference Location                       Topic / Reason for (n/a)
25.111(d)         Cover Letter, FCC Form 312       ITU cost recovery
25.111(d)         Attachment C – Section 11        ITU filing
25.156, 25.157    Narrative                        Processing round
25.202(e)         Attachment C – Section 7         Frequency tolerance
25.202(f)(1-3)    Attachment C – Section 8         Out-of-band emissions
25.207            Attachment C – Section 10        Cessation of emissions
25.208(a-g)       Attachment C – Section 12        PFD analysis
25.210(f)         Attachment C – Section 9         Full frequency reuse
25.210(j)         n/a                              EW station keeping tolerance
25.283(a-c)       Attachment D – Orbital Debris    End-of-life Disposal




                                               2



Document Created: 2019-08-07 17:26:16
Document Modified: 2019-08-07 17:26:16

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC