Attachment DA 081955

DA 081955

ORDER submitted by IB,FCC

DA 081955

2008-08-26

This document pretains to SAT-LOA-20070622-00085 for Application to Launch and Operate on a Satellite Space Stations filing.

IBFS_SATLOA2007062200085_660821

                                    Federal Communications Commission                                  DA 08-1955



                                           Before the
                                Federal Communications Commission
                                      Washington, D.C. 20554


In the Matter of                                          )
                                                          )
Spectrum Five, LLC                                        )
                                                          )
Petition for Clarification of Condition                   )
in EchoStar 11 License                                    )

                                                 ORDER

Adopted: August 26, 2008                                               Released: August 26, 2008

By the Chief, International Bureau:

I. INTRODUCTION

          1. In this Order, we grant a request filed by Spectrum Five, LLC (Spectrum Five) to the
extent that we are adding an additional term or condition for the operation of the EchoStar 11
satellite, pursuant to an existing condition of the EchoStar 11 satellite license held by EchoStar
Satellite Operating Corporation (EchoStar) 1 As discussed below, we have determined that this
new term or condition is necessary in order to effectuate the coordination and/or agreements
required by EchoStar’s authorization.

II. BACKGROUND

         2. Spectrum Five is a Direct Broadcast Satellite (DBS) operator licensed by the
Netherlands. On behalf of Spectrum Five, the Netherlands filed documentation for two satellites
at the 114.5° W.L. orbit location with the International Telecommunication Union (ITU) on
March 29, 2005. In 2006, Spectrum Five was permitted to enter the U.S. market for DBS
services using those two satellites at 114.5° W.L., between neighboring DBS satellites at 110°
W.L. and 119° W.L.2

       3. In January 2008, EchoStar was granted authority to launch and operate EchoStar 11, a
DBS satellite at the 110° W.L. orbit location.3 Subsequently, on May 15, 2008, the United States
made a filing with the ITU for EchoStar 11 (USABSS-30). Spectrum Five notes, however, that

1
    See Policy Branch Information, Public Notice, DA 08-120 (released Jan. 18, 2008).
2
  Spectrum Five, LLC, Petition for Declaratory Ruling to Serve the U.S. Market Using Broadcast Satellite
Service (BSS) Spectrum from the 114.5° W.L. Orbital Location, Order, 21 FCC Rcd 14023, 14043 (para.
43) (Int'l. Bur., 2006)(Spectrum Five Order). One of the satellites at the 110° W.L. location at that time
was the EchoStar 8 satellite, which has ITU date priority over the Spectrum Five satellites. Spectrum Five's
access to the U.S. market was conditioned on Spectrum Five completing coordination with its neighboring
satellite operators.
3
    See Policy Branch Information, Public Notice, DA 08-120 (released Jan. 18, 2008).


                                      Federal Communications Commission                                DA 08-1955


the ITU has not yet published the documentation for the EchoStar 11 satellite.4 One of the
conditions placed on the EchoStar 11 authorization reads as follows:

             EchoStar shall provide the Commission with all information it requires in order
             to modify the Appendix 30 BSS Plan and associated Appendix 30A feeder-link
             Plan to incorporate the characteristics of the BSS space station of the EchoStar
             11 satellite, USABSS-30, in accordance with the ITU Radio Regulations.
             EchoStar shall be held responsible for all cost recovery fees associated with these
             ITU filings. We also note that no protection from interference caused by radio
             stations authorized by other administrations is guaranteed unless coordination
             and notification procedures are timely completed, or, with respect to individual
             administrations, coordination agreements are successfully completed. Any radio
             station authorization for which coordination has not been completed and/or for
             which the necessary agreements under Appendices 30 and 30A have not been
             obtained may be subject to additional terms and conditions as required to effect
             coordination or obtain the agreement of other Administrations.5

         4. On August 8, 2008, Spectrum Five filed a petition for clarification regarding the
conditions in the EchoStar 11 license. Specifically, according to Spectrum Five, under the
condition quoted above, "the Commission should not permit EchoStar to exceed the parameters
specified in the current U.S. assignment in the Region 2 BSS Plan6 and associated Feeder Link
Plan at 110° W.L. unless and until EchoStar (1) fulfills its obligation to secure the agreement of
the Netherlands, or (2) provides explicit technical information to demonstrate that such
coordination can be effected."7

         5. Spectrum Five explains that the EchoStar 11 satellite is a replacement for the EchoStar
8 satellite at 110° W.L.8 Spectrum Five further notes that the EchoStar 11 satellite is designed to
operate at higher power levels than the EchoStar 8 satellite that it is replacing.9 Spectrum 5
argues that the EchoStar 11 satellite deviates from the Region 2 BSS Plan, and that "EchoStar
grossly underestimates the degree to which EchoStar 11 will increase interference to the
Spectrum Five network."10




4
  Letter from Todd M. Stansbury, Counsel for Spectrum Five, to Marlene H. Dortch, Secretary, FCC
(dated Aug. 21, 2008) (Spectrum Five Letter) at 1.
5
     See EchoStar 11 License, Call Sign S2738.
6
  The current U.S. assignment in the Region 2 BSS Plan for 110° W.L. is EchoStar 6. However, in an ex
parte statement filed on August 21, 2008, Spectrum Five states that the EchoStar 11 satellite should not be
operated at power levels above those of EchoStar 8, prior to coordination or provision of technical
information to demonstrate that such coordination can be effected. Spectrum Five Letter at 1-2.
7
     Spectrum Five Petition at 1.
8
     Id. at 2.
9
     Id. at 2.
10
     Id. at 2-3.



                                                      2


                                      Federal Communications Commission                            DA 08-1955


        6. Spectrum Five seeks to ensure that its ITU priority rights can be effectively enforced
by the Commission notwithstanding the anticipated future service disruptions to EchoStar's
subscribers if EchoStar 11 commences service at 110° W.L. prior to completion of coordination
with Spectrum Five.11 Spectrum Five further asserts that EchoStar has not attempted to
coordinate the EchoStar 11 satellite with Spectrum Five's planned satellite at 114.5° W.L.,12 even
though Spectrum Five has attempted to contact EchoStar to coordinate.13 Therefore, Spectrum
Five "urges the Commission to clarify the conditions in EchoStar 11's authorization to prohibit
operation of the satellite outside the parameters set forth in the existing U.S. BSS assignment at
110° W.L. until such time as EchoStar can complete coordination or demonstrate that
coordination is feasible."14 Therefore, Spectrum Five maintains that the clarification it seeks
would serve the public interest by preventing harmful interference to its higher priority satellites,
and by eliminating the risk of significant consumer confusion and harm.15

         7. On August 18, 2008, EchoStar filed an opposition to Spectrum Five's petition,
claiming that the petition was not timely filed. EchoStar contends further that it cannot
coordinate EchoStar 11 with Spectrum Five's satellites until those satellites are coordinated with
EchoStar 8, because that coordination will require Spectrum Five to redesign its satellites.
Finally, according to EchoStar, it is unreasonable to require EchoStar 11 to reduce its power
before the Spectrum Five satellites are launched.

III. DISCUSSION

          8. Pursuant to the EchoStar 11 license condition quoted above, EchoStar "may be subject
to additional terms and conditions as required to effect coordination or obtain the agreement of
other Administrations." We find here that an additional term of operation, whereby EchoStar
would be required to tailor its EchoStar 11 operations to avoid interference to any operational
system that has a higher ITU priority than the priorities obtained by EchoStar, is a necessary part
of a successful coordination, given that EchoStar interference with an operational Spectrum 5
network having higher ITU priority would inevitably impair coordination negotiations.16 To this
end, we hereby impose the following requirement on EchoStar’s operation of the EchoStar 11
satellite (whose ITU filing is USABSS-30):

           If coordination for EchoStar 11 has not been completed and/or necessary agreements
           under Appendices 30 and 30A have not been obtained with a satellite network having
           ITU date of receipt priority, and if a satellite network with superior ITU date of receipt
           priority is brought into use at its assigned location and receives harmful interference, then
11
     Spectrum Five Letter at 1.
12
     Spectrum Five Petition at 4-5.
13
     Spectrum Five Letter, Attachment.
14
     Spectrum Five Petition at 5.
15
     Spectrum Five Petition at 5.
16
   Spectrum Five styles its request as an "Emergency Request for Clarification of Conditions on
the Operation of the EchoStar 11 DBS satellite at 110° W.L." Petitions for clarification are
governed by Section 1.2 of the Commission's rules, 47 C.F.R. § 1.2. Section 1.2 does not include
any provisions regarding deadlines for filing a petition for clarification. For this reason, we do not
agree with Echostar that we should reject Spectrum Five’s request as being untimely filed.


                                                    3


                                Federal Communications Commission                             DA 08-1955


       EchoStar 11 must modify its operations to not exceed the technical specifications of the
       nominal 110° W.L. location in the Region 2 BSS plan, as such specifications would be
       modified by the pending EchoStar 8 plan modification proposal (to the extent the
       EchoStar 8 proposal has ITU date of receipt priority with respect to the satellite network
       brought into use).

IV. ORDERING CLAUSES

     9. Accordingly, IT IS ORDERED that the request of Spectrum Five, LLC, IS
GRANTED to the extent indicated above and otherwise DENIED.



                                        FEDERAL COMMUNICATIONS COMMISSION



                                        Helen Domenici
                                        Chief, International Bureau