Attachment erratum

This document pretains to SAT-AMD-20040319-00041 for Amended Filing on a Satellite Space Stations filing.

IBFS_SATAMD2004031900041_371526

                                              HOGAN & HARTSON
                                                                     L.L.P.

                                                                                                                          COLUMBIA SQUARE
                                                                                                                     555 THIRTEENTH STREET, NW _
 mxsc&:‘ggINGS                                                                                                        WASHINGTON, DC 20004—1109
    (202) 637—5767                                           April 21, 2004                                                   TEL (202) 637—5600
KAHASTINGS@HHLAW . COM                                                                                                        FAX (202) 637—5910

                                                                                                                              WWW.HHLAW.COM

     BY HAND DELIVERY                                               H\ES‘MGOW                           RECElVED
     Ms. Marlene H. Dortch
     Secretary                                                                                              APR 2 1 2004
     Federal Communications Commission                                                        |                           +             a
     445 12th Street, S.W.   |                                                                                CATIONS
                                                                                                    Fapean.mfl“*       COMMISBtON _
                                                                                                                 decretam
     Washington, D.C. 20554

                         Re: Erratum toFile No. SAT—AMD—20040319—00041
     Dear Ms. Dortch:

                  SES AMERICOM, Inc., by its attorneys and pursuant to discussions
     with International Bureau staff, hereby submits an erratum to the above—referenced
     amendment, which proposes the re—location of AMC—9 to 83° W.L. in early 2005 (the
     "Amendment"). Attached are corrected pages A—12 through A—14 of the narrative
     technical appendix of the Amendment, with Tables 20bis, 21bis, 27bis, and 28bis.
     The numerical data presented in these tables are unchanged. However, SES
     AMERICOM has corrected typographical errors in the description of certain
     parameters in the tables, revising the parameter labels to reflect the terminology
     more typically used in reference to analog carriers. SES AMERICOM requests that
     the attached pages be substituted for the corresponding pages of the Amendment.

                     Please direct any questions regarding this submission to the
     undersigned.
                                                                    Respectfully submitted,



                                                                    Karis A. Hastings
                                                                    Counsel for SES AMERICOM, Inc.

     Attachment
     ce:  Jennifer Gilsenan
          Robert Nelson
          Kal Krautkramer



                             BERLIN    BRUSSELS   LONDON    PARIS   BUDAPEST   PRAGUE    WARSA4W   MOSCOW   TOKYO

                         NEW YORK     BALTIMORE   McLEAN   MIAMI    DENVER   BOULDER    COLORADO SPRINGS    LOS ANGELES


                               Table 20bis

           Uplink Link Budget Calculations TV/FM

                 Parameter                   TV/FM
Transmit Power(dBW)                           25.10
Transmit Loss (dB)                            —0.50
Antenna Gain (dBi)                            53.20
Ground Station EIRP (dBW)                     77.80
Uplink Rain Loss (dB)                         0.00
Free Space Loss (dB)                         —200.10
Satellite G/T (dB/K)                          —3.10
Bandwidth (dB—Hz)                             75.56
Boltzmann‘s Constant (dBW/K—Hz)              —228.60
C/N (dB)    _                       |         27.64
C/I (dB)                                      25.00
Total C/(N + I) (dB)                          23.11



                               Table 21bis

 Downlink Link Budget and Overall Calculation TV/FM

                 Parameter                   TV/FM
Satellite Carrier EIRP (dBW)                  37.00
Downlink Rain Loss (dB)                       —0.50
Free Space Loss (dB)                         —196.30
Ground Station G/T (dB/K)                    23.70
Bandwidth (dB—Hz)                             75.56
Boltzmann‘s Constant (dBW/K—Hz)              —228.60
C/N (dB)                                      16.94
C/I (dB)                                      19.00
C/(N + I) (dB)                                14.84
Total UP/DOWN C/(N+1)(dB)                     14.24
Required                                     12.00
Margin                                        2.24




                             Page A—12


                                        —Table 22

           Ku—Band Earth Station Sizes Used in Link Budget Analysis

        Carrier Type                Earth Station Diameter            Earth Station Diameter
                                       Uplink (meters)                  Downlink (meters)
TV/FM                                         6.1                              3.7




                                         Table 27bis

                       Uplink Link Budget Calculations TV/FM

                          Parameter                          TV/FM
            Transmit Power(dBW)                               22.00
            Transmit Loss (dB)                                —1.00
            Antenna Gain (dBi)                                57.20
            Ground Station EIRP (dBW)                         78.20
            Uplink Rain Loss (dB)                             —2.00
            Free Space Loss (dB)                             —207.50
            Satellite G/T (dB/K)                              —2.00
            Bandwidth (dB—Hz)                                75.56
            Boltzmann‘s Constant (dBW/K—Hz)                  —228.60
            C/N (dB)                                          19.74
            C/I (dB)                                         25.00
            Total C/(N + I) (dB)                              18.61




                                      Page A—13


                                             Table 28bis

               Downlink Link Budget and Overall Calculation TV/FM

                               Parameter                         TV/FM
              Satellite Carrier EIRP (dBW)                         49.40
              Downlink Rain Loss (dB)                              —3.00
              Free Space Loss (dB)                                —~206.30
              Ground Station G/T (dB/K)                            29.36
              Bandwidth (dB—Hz)                                    75.56
              Boltzmann‘s Constant (dBW/K—Hz)                     —228.60
              C/N (dB)                                             22.50
              C/I (dB)                                             24.00
              C/(N + I) (dB)                                       20.18
              Total UP/DOWN C/(N+1)(dB)           '                16.31
              Required                                             12.00
              Margin                                               4.31




4.0   Spacecraft Bus Description




4.1   Electrical Power Subsystem

The power subsystem provides electrical power generation, storage, conditioning and

distribution to ensure uninterrupted communications services over the life of the mission. The

solar array will provide sufficient margin to perform the mission over the spacecraft‘s 15—year .

life. The original application for AMC—9 provided the end—of—life power budget. Table 30a

below provides the beginning—of—life ("BOL") power budget.




                                           Page A—14



Document Created: 2004-04-22 09:24:06
Document Modified: 2004-04-22 09:24:06

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC