2ATQ5-CPDL70W-1

FCC ID

Equipment: Wireless Cutter Module

Guang Zhou Hao Yang Electronic Co., Ltd. -CPDL70W-1

No.109 Hai Yong Road Shi Ji Village Pan Yu, Guangzhou, N/A 511450 China

Application
Frequency Range
Final Action Date
Granted
7e72d5bxfjLPAEbAdjaC8Q==
2407.0-2477.0
2019-07-09
APPROVED
File NameDocument TypeDateDirect
RF ExposureRF Exposure Info 2019-07-09 00:00:00 pdf
Internal PhotosInternal Photos 2019-07-09 00:00:00 pdf
Label Artwork and LocationID Label/Location Info 2019-07-09 00:00:00 pdf
External PhotosExternal Photos 2019-07-09 00:00:00 pdf
Test Setup PhotosTest Setup Photos 2019-07-09 00:00:00 pdf
Test ReportTest Report 2019-07-09 00:00:00 pdf
User ManualUsers Manual 2019-07-09 00:00:00 pdf
Modular ApprovalCover Letter(s) 2019-07-09 00:00:00 pdf
Confidentiality RequestCover Letter(s) 2019-07-09 00:00:00 pdf
Letter of AgencyCover Letter(s) 2019-07-09 00:00:00 pdf
Block DiagramBlock Diagram N/A
Circuit DiagramSchematics N/A
Technical DescriptionOperational Description N/A

Application Details:

EquipmentWireless Cutter Module
FRN0028537991
Grantee Code2ATQ5
Product Code-CPDL70W-1
Applicant BusinessGuang Zhou Hao Yang Electronic Co., Ltd.
Business AddressNo.109 Hai Yong Road Shi Ji Village Pan Yu , Guangzhou,N/A China 511450
TCB ScopeA2: Low Power Transmitters (except Spread Spectrum) and radar detectors operating above 1 GHz
TCB Email[email protected]
ApplicantWeibin Liang –
Applicant Phone 211
Applicant Fax86-20-39966389
Applicant Email[email protected]
Applicant MailStop
Test FirmIntertek Testing Services Shenzhen LTD., Guangzhou
Test Firm ContactMr. Strong Yao
Test Firm Phone
Test Firm Fax
Test Firm Email[email protected]
Certified ByDaniel He – Project Engineer
Comment [7e72d5bxfjLPAEbAdjaC8Q==]: Co-location of this module with other transmitters that operate simultaneously are required to be evaluated using the FCC multi-transmitter procedures. The module antenna(s) must be installed to meet the RF exposure compliance separation distance of 20 cm and any additional testing and authorization process as required. The module grantee is responsible for providing the documentation to the system integrator on restrictions of use, for continuing compliance of the module. The host integrator installing this module into their product must follow the integration instructions provided by the module manufacturer and must ensure that the final composite product complies with the FCC requirements by a technical assessment or evaluation to the FCC rules, including the transmitter operation and should refer to guidance in KDB 996369.

© 2019 FCC.report
This site is not affiliated with or endorsed by the FCC