Special Temporary Authority application - Applicant Name
Name of Applicant:
Raytheon Company
Special Temporary Authority application - Best Contact
First Name:
Sharmeen
Last Name:
Browarek
Phone Number:
(978)-604-4314
Title:
Systems Engineer
Special Temporary Authority application - Certification
Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2013-11-14 00:00:00.0
Signature of Applicant (Authorized person filing form):
Richard A. Haycook
Title of Applicant (if any):
HQ IDS Spectrum Manager.RF Safety
Special Temporary Authority application - Explanation
Please explain in the area below why an STA is necessary:
STA Explanation: The prototype noise antenna test kit is planned to be operated at the Raytheon Test Facility in Pelham, NH over the period of December 6th, 2013 – June 6th, 2014. The purpose of this request for Special Temporary Authorization is to integrate our proof of design before presenting it to the customer. Test Summary: An experimental license is required to integrate a prototype radar diagnostic tool before presenting to our customer. Starting in December 2013, we will be using a noise source generator with a digital band pass filter to limit the noise source within the 5250 – 5850 MHz band. The source will be a continuous wave source operating at a maximum 2W output. The calculations for the power output, cable losses, etc can be found below. The noise source will be emitted from a horn mounted atop a 9 m mast, connected to a 50 foot cable. It will be on just long enough for the radar to receive the signal and run the test to evaluate the radar health. The radar under test will be in receive mode only.
Special Temporary Authority application - Information
Callsign:
WH9XCC
Class of Station:
FX
Nature of Service:
Experimental
Special Temporary Authority application - Initial values - Purpose of Operation
Please explain the purpose of operation:
Frequency authorization is requested for the period of December 6th, 2013– June 6th, 2014 in the 5250 – 5850 MHz band in order to develop a C-Band noise antenna test kit. The kit will be a diagnostic tool, allowing us to troubleshoot the radar when issues arise in field. The target radar will be in receive-only mode during these tests. Integration will take place at the Raytheon Test Facility, Pelham, NH. The customer demonstration is planned to take place at another location (TBD).
Special Temporary Authority application - Initial values - Requested Period of Operation
Operation End Date:
06/06/2014
Special Temporary Authority application - Manufacturer
Equipment 1 Experimental
Yes
Equipment 1 Manufacturer
Noise Com Incorporated
Equipment 1 Model Number
NC9282
Equipment 1 No. Of Units
1
Special Temporary Authority application - Purpose of Operation
Please explain the purpose of operation:
To test and develop a C-Band noise antenna test kit. Frequency authorization is requested for the period of December 6th, 2013– June 6th, 2014 in the 5250 – 5850 MHz band in order to develop a C-Band noise antenna test kit. The kit will be a diagnostic tool, allowing us to troubleshoot the radar when issues arise in field. The target radar will be in receive-only mode during these tests. Integration will take place at the Raytheon Test Facility, Pelham, NH. The customer demonstration is planned to take place at another location (TBD).
Special Temporary Authority application - Requested Period of Operation