Experimental Licensing System

1729-EX-ST-2026

Northrop Grumman Systems Corporation

Experimental Licensing System filing 1729-EX-ST-2026 submitted by Northrop Grumman Systems Corporation.

Filing overview

StatusPending
Call signWX9XKA
Date filed2026-09-14
Status date2026-09-14
FCC sourceView the FCC filing record

Special Temporary Authority application - Address

Attention:
c/o Wilkinson Barker Knauer, LLP
City:
Washington
E-Mail Address:
lmontgomery@wbklaw.com
State:
DC
Street Address:
1800 M Street NW, Suite 800N
Zip Code:
20036

Special Temporary Authority application - Applicant Name

Name of Applicant:
Northrop Grumman Systems Corporation

Special Temporary Authority application - Best Contact

First Name:
Daniel
Last Name:
Rodgers
Phone Number:
703-234-9063
Title:
Sr. Principal RF Microwave Design Engineer

Special Temporary Authority application - Certification

Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2026-08-27 00:00:00.0
Signature of Applicant (Authorized person filing form):
Daniel Rodgers
Title of Applicant (if any):
Sr. Principal RF MDE

Special Temporary Authority application - Explanation

Please explain in the area below why an STA is necessary:
Northrop Grumman Systems Corporation (NGSC) will launch and operate the NG-25 Cygnus spacecraft as part of the NASA Commercial Resupply Services 2 (CRS2) program. The Cygnus mission will be up to 180 days in length, as follows:•Launch (from Cape Canaveral, Florida), orbit-raising maneuvers, and approach to ISS (3 days) •Berthed operations (up to 170 days) •De-berthing, departure, orbit maneuvers, and controlled, destructive re-entry into Earth’s atmosphere over southern Pacific Ocean (2 to 7 days) Cygnus spacecraft telemetry will be transmitted during all phases of the mission. An STA is required for the Cygnus spacecraft due to the short duration of the mission and because of the need for frequency coordination among users of the applicable frequency bands. This STA application is consistent with FCC/NTIA policies and is similar to STA applications submitted for previous Cygnus spacecraft.

Special Temporary Authority application - Information

Callsign:
WX9XKA
Class of Station:
MO
Nature of Service:
Experimental

Special Temporary Authority application - Manufacturer

Equipment 1 Experimental
Yes
Equipment 1 Manufacturer
L-3Harris Cincinnati Electronics
Equipment 1 Model Number
6354-PF4520-05
Equipment 1 No. Of Units
2
Equipment 2 Experimental
Yes
Equipment 2 Manufacturer
L-3Harris Cincinnati Electronics
Equipment 2 Model Number
6354-PF4520-06
Equipment 2 No. Of Units
2

Special Temporary Authority application - Purpose of Operation

Please explain the purpose of operation:
Spacecraft telemetry links are for monitoring of Cygnus spacecraft state of health. Telemetry links include: • S-Band Single Access (SSA) and S-Band Multiple Access (SMA) spread spectrum return link operation with NASA TDRS. • High data rate downlink operation with mission Ground Stations • Cygnus to ISS link for proximity operations will be used during the mission. The transmitters supporting these links are described below: The Cygnus spacecraft configuration will comprise of two L-3Harris Cincinnati Electronics (L-3 CE) transmitters (primary & redundant-backup) operating at 2287.5 MHz in TDRS mode and it will also provide telemetry downlinks at 3 Mbps and 6 Mbps. Two additional transmitters (primary & redundant-backup), also procured from L-3Harris CE, operating at 2203.2 MHz will be used for the Cygnus to ISS proximity communication link. These transmitters will meet all STA parameters and conditions as compiled with previous CRS STA applications.

Special Temporary Authority application - Requested Period of Operation

Operation End Date:
05/23/2027
Operation Start Date:
11/24/2026

Frequencies

ActionLower MHzUpper MHzClassOutput WERP WEmissionSignal
NewMO14.3200004.6400003M00G1DSQPSK
NewMO14.3200004.6400004M98G1DSQPSK
NewMO14.5900007.9300005M93G1DSQPN
NewMO14.3200004.6400006M16G1DSQPN
NewMO23.8800007.7400006M16G1DSQPN

Sites

SiteLocationCoordinatesOperating areaCountyRadius
North WestLEO Spacecraft-415km altitude-51

Sources and provenance

SourceSource recordRetrievedMatch
ELS1729-EX-ST-20262026-09-15 05:13:15Direct Source Record
Selected field provenance
FieldDisplayed valueSourceObserved
StatusPendingELS 1729-EX-ST-20262026-09-15 05:13:15
Applicant NameNorthrop Grumman Systems CorporationELS 1729-EX-ST-20262026-09-15 05:13:15
Call SignWX9XKAELS 1729-EX-ST-20262026-09-15 05:13:15
Receipt Date2026-09-14ELS 1729-EX-ST-20262026-09-15 05:13:15
Status Date2026-09-14ELS 1729-EX-ST-20262026-09-15 05:13:15

Documents

DocumentTypeDateStatus
Attch 6 Stop Buzzer InformationText Documents2026-09-14Pending archive
Attch 5 Ground Station LocationsText Documents2026-09-14Pending archive
Attch 4 Debris Assessment ReportText Documents2026-09-14Pending archive
Attch 3 Deep Space Network DSN Protection Compliance AnalysisText Documents2026-09-14Pending archive
Attch 2 PFD Exceedance Summary TablesText Documents2026-09-14Pending archive
Attch 1 Power Flux Density PFD AnalysisText Documents2026-09-14Pending archive