Special Temporary Authority application - Applicant Name
Name of Applicant:
Fujitsu Network Communications
Special Temporary Authority application - Best Contact
First Name:
Thomas
Last Name:
Cokenias
Phone Number:
650 726 1263
Title:
Agent for Fujitsu
Special Temporary Authority application - Certification
Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2005-11-30 00:00:00.0
Signature of Applicant (Authorized person filing form):
THOMAS N COKENIAS
Title of Applicant (if any):
Agent for Intel Corporation
Special Temporary Authority application - Explanation
Please explain in the area below why an STA is necessary:
Fujitsu needs to perform over the air test on a 3.5 GHz WiMax radio network.
Special Temporary Authority application - Information
Callsign:
WC9XJJ
Class of Station:
FX
Nature of Service:
Experimental
Special Temporary Authority application - Initial values - Purpose of Operation
Please explain the purpose of operation:
Fujitsu Network Communications proposes a WiMAX test network for its Richardson, TX campus. The purpose of this network would be technical demonstration of WiMAX equipment to potential purchasers, development of radio technique from field testing of equipment, and development of operational and engineering data related to full-scale deployments of WiMAX networks with future products operating in the 2.3GHz and 2.5GHz spectrum. Capabilities of WiMAX would be demonstrated by the proposed network including several new and burgeoning telecommunications technologies: VoIP, IPTV, streaming video, as well as standard broadband data connectivity. In addition, development of deployment techniques such as equipment installation; development of curriculum for operational training; and collection of engineering data such as field strength and signal to noise ratio, can be satisfied by the proposed network. The network would consist of a centrally located base station on the Fujitsu campus, with remote subscriber units located at geographically dispersed points. The exact location and number of the subscriber units would change dependent on the particular application being tested at any given time. It is expected that at least two subscriber stations would be permanently located within on-campus buildings and that several nomadic subscriber units would be intermittently employed for field strength test and technical demonstrations.
Special Temporary Authority application - Manufacturer
Equipment 1 Experimental
No
Equipment 1 Manufacturer
see exhibit
Equipment 1 Model Number
see exhibit
Equipment 1 No. Of Units
11
Special Temporary Authority application - Purpose of Operation
Please explain the purpose of operation:
Technical demonstration of WiMAX equipment to potential purchasers, development of radio technique from field testing of equipment, and development of operational and engineering data. related to full-scale deployments of WiMAX networks with future products operating in the 2.3GHz and 2.5GHz spectrum. Capabilities of WiMAX would be demonstrated by the proposed network including several new and burgeoning telecommunications technologies: VoIP, IPTV, streaming video, as well as standard broadband data connectivity. In addition, development of deployment techniques such as equipment installation; development of curriculum for operational training; and collection of engineering data such as field strength and signal to noise ratio, can be satisfied by the proposed network. The network would consist of a centrally located base station on the Fujitsu campus, with remote subscriber units located at geographically dispersed points. The exact location and number of the subscriber units would change dependent on the particular application being tested at any given time. It is expected that at least two subscriber stations would be permanently located within on-campus buildings and that several nomadic subscriber units would be intermittently employed for field strength test and technical demonstrations.
Special Temporary Authority application - Requested Period of Operation