Special Temporary Authority application - Applicant Name
Name of Applicant:
BAE Systems
Special Temporary Authority application - Best Contact
First Name:
Eric
Last Name:
Vogel
Phone Number:
603-885-7591
Title:
Principal Systems Engineer
Special Temporary Authority application - Certification
Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2002-09-13 12:13:09.143
Signature of Applicant (Authorized person filing form):
Eric Vogel
Title of Applicant (if any):
Principal Systems Engineer
Special Temporary Authority application - Explanation
Please explain in the area below why an STA is necessary:
This STA is required to perform verification testing of low-VHF transmit and receive capabilities for an experimental system under development by BAE SYSTEMS. The system is being developed and demonstrated as part of a contract between BAE SYSTEMS and the Defense Advanced Research Projects Agency.
Special Temporary Authority application - Information
Callsign:
WC2XVU
Class of Station:
FX
Nature of Service:
Experimental
Special Temporary Authority application - Initial values - Information
Class of Station:
FX MO
Special Temporary Authority application - Initial values - Purpose of Operation
Please explain the purpose of operation:
Live testing is required to verify proper operation of the experimental system. Two transmitters will be installed with the intent of transmitting 5W or less in the low VHF frequency band. The testing will verify the military utility and operational suitability of the experimental system. The operations will be confined physically to BAE SYSTEMS campus in Hudson, NH. All transmissions will be short in duration and be conducted at the lowest possible power settings (all less than 5W). The local spectrum has been surveyedto ensure that selected channels do not interfere with any existing stations.
Special Temporary Authority application - Manufacturer
Equipment 1 Experimental
Yes
Equipment 1 Manufacturer
BAE SYSTEMS Transmitter (see above)
Equipment 1 Model Number
N/A
Equipment 1 No. Of Units
2
Special Temporary Authority application - Purpose of Operation
Please explain the purpose of operation:
Verification testing and demonstration of a low-VHF experimental system being developed under a contract with the Defense Advanced Research Projects Agency.
Special Temporary Authority application - Requested Period of Operation