Special Temporary Authority application - Applicant Name
Name of Applicant:
BAE SYSTEMS
Special Temporary Authority application - Best Contact
First Name:
Micheal
Last Name:
O'Brien
Phone Number:
603-885-4886
Title:
System Engineer
Special Temporary Authority application - Certification
Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2005-01-27 00:00:00.0
Signature of Applicant (Authorized person filing form):
William S. Bryan
Title of Applicant (if any):
System Engineer
Special Temporary Authority application - Explanation
Please explain in the area below why an STA is necessary:
Information from previous power tests showed high VSWR in the system. Additional testing at lower power levels provided confidence in the design changes. We are now required to conduct tests at the higher power levels to insure there are no unknown thermal issues when operating at the higher powers expected for wideband and typical rain conditions.
Special Temporary Authority application - Information
Callsign:
WC2XUQ
Class of Station:
FX
Nature of Service:
Experimental
Special Temporary Authority application - Initial values - Purpose of Operation
Please explain the purpose of operation:
The need is to test at higher power for a limited duration. The test is expected to last for approximately 6 hours. This test will verify design changes. The planned tests will be with approximately 5 CW signals in each band. The specific frequencies are nearly evenly distributed across the frequency ranges identified below. Reference attached exhibit that highlights the steps taken to avoid interference with other licensed operators in the frequency bands of interest.
Special Temporary Authority application - Manufacturer
Equipment 1 Experimental
No
Equipment 1 Manufacturer
BAE SYSTEMS
Equipment 1 Model Number
N/A
Equipment 1 No. Of Units
2
Special Temporary Authority application - Purpose of Operation
Please explain the purpose of operation:
Conducting system tests to ensure there are no unknown thermal issues for wideband and typical rain conditions when operating at higher powers. The need is to test at higher power for a limited duration. The test is expected to last for approximately 6 hours. This test will verify design changes. The planned tests will be with approximately 5 CW signals in each band. The specific frequencies are nearly evenly distributed across the frequency ranges identified below. Reference attached exhibit that highlights the steps taken to avoid interference with other licensed operators in the frequency bands of interest.
Special Temporary Authority application - Requested Period of Operation