Special Temporary Authority application - Applicant Name
Name of Applicant:
BAE Systems Information and Electronic Systems Integration Inc.
Special Temporary Authority application - Best Contact
First Name:
Edward
Last Name:
Mullin
Phone Number:
(603) 885-0210
Title:
Test Engineer
Special Temporary Authority application - Certification
Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2008-07-10 00:00:00.0
Signature of Applicant (Authorized person filing form):
Don Haes
Title of Applicant (if any):
CHP
Special Temporary Authority application - Explanation
Please explain in the area below why an STA is necessary:
BAE Systems requests that the Commission grant special temporary authority (STA) to permit BAE Systems to operate the facilities (the Facilities) specified in the instant application. STA is requested for a period of six (6) months. This experiment / demostration will test from August 15 to Febuary 15, 2008. It requires a transmitter in the GPS band (L1 = 1575.42 MHz) and (L2 = 1227.6 MHz) to be used indoors. A demonstration will be conducted inside the manufacturing facility which will require a transmit EIRP power of no greater than -140 dBm/ 24 MHz at 100 feet. See attachment files for 0367-EX-ST-2008 for a description of the maximum power limit calculations per NTIA regulations. Area of potential interference to GPS reception shall be under the control of BAE. To report interference and notify the operator of this experiment to cease transmission, use the contact information provided: Robert D.Green - PH: (512) 415-4916 and Michael E. Anderson - PH: (603) 885-2851. BAE will post a sign on doors to the testing area stating GPS re-radiator in use and your GPS signal may be in error. An STA is required because the experiment / demonstration as described would violate Sections 2.803 and 15.205(a) of the Commissions Rules (Title 47 C.F.R. ยงยง 2.803 and 15.205(a). )
Special Temporary Authority application - Information
Callsign:
WD9XLF
Class of Station:
FX
Nature of Service:
Experimental
Special Temporary Authority application - Initial values - Explanation
Please explain in the area below why an STA is necessary:
Please See Exhibit 1
Special Temporary Authority application - Initial values - Purpose of Operation
Please explain the purpose of operation:
Please See Exhibit 1
Special Temporary Authority application - Manufacturer
Equipment 1 Experimental
No
Equipment 1 Manufacturer
Antcom
Equipment 1 Model Number
2.3G1215P-XRS-4
Equipment 1 No. Of Units
1
Equipment 2 Experimental
No
Equipment 2 Manufacturer
Antcom
Equipment 2 Model Number
2.3G1215A-XRS-4
Equipment 2 No. Of Units
1
Equipment 3 Experimental
No
Equipment 3 Manufacturer
Minicircuits
Equipment 3 Model Number
ZX60-2522M
Equipment 3 No. Of Units
1
Equipment 4 Experimental
No
Equipment 4 Manufacturer
Minicircuits
Equipment 4 Model Number
BW-S3W2
Equipment 4 No. Of Units
1
Special Temporary Authority application - Purpose of Operation
Please explain the purpose of operation:
BAE Systems requests the use of a GPS re-radiation system to permit testing of GPS navigation systems. BAE Systems requests the use of a GPS re-radiation system to permit testing of GPS navigation systems inside its manufacturing facility, an engineering prototype lab, and a product development lab, where a STOP Buzzer will be implemented. All conditions in NTIA Manual of Regulation and procedures for Federal Radio Frequency Mangement, section 8.3.28, as required for transmissions in the GPS band will be followed.
Special Temporary Authority application - Requested Period of Operation