Welink Communication

0423-EX-ST-2019

Status: Pending

N/A
2019-03-12
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Welink Communication

Address
Attention: 3451 Triumph Blvd, 2nd Floor
Street Address: 3451 Triumph Blvd, 2nd Floor
P.O. Box: 84043
City: Lehi
State: UT
Zip Code: 84043
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Naim
First Name: Muhammad
Title: VP Technology
Phone Number: 8442859434

Explanation
Please explain in the area below why an STA is necessary:
Welink Communications is working with partner companies to develop equipment that will use LTE technologies, using Citizens Band Radio Service (CBRS) spectrum [3550 - 3700 MHz], also known as Band 48, using 3GPP terminology. As part of the technology validation, Welink plans to conduct a series of field tests with both EUD and category A at one or more locations. The testing will benefit the public interest by enabling the pre-commercial testing of new products outside of a lab environment but in a controlled and managed manner. In addition to the product development testing described above, Welink and partner companies intend to conduct separate and independent lab testing in a real-world environment at a Welink facility or at a vendor's facility using specifications developed by the WINN Forum and CBRS Alliance. This trial will consist of an aggregate of up to 20 small cells (category A or EUD) for all the trial locations. The CBSDs will use the transmission parameters and operate inside the geographic regions defined below. These tests will use base stations and user equipment operating in CBRS spectrum only. Although the devices are prototypes and have not completed formal equipment authorization, the equipment used in these trials will be compliant with FCC rules, per 2nd Order Report and Order. Equipment from multiple equipment manufacturers will be used in the evaluation testing. Welink has the ability to shut down all transmissions operated under the experimental license in the unlikely event any interference occurs.

Purpose of Operation
Please explain the purpose of operation:  Product development testing of CBRS equipment. Outdoor installations 2) Evaluation of end-to-end CBRS architecture 3) Evaluation of coexistence mechanisms with shared spectrum (GAA) and PAL spectrum 4) Overall evaluation of TDD-LTE using 3.5 GHz Field tests will be conducted in highly controlled field environment, in order to assist in the development of commercial products.

Information
Callsign: WO9XNL
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 05/15/2019
Operation End Date: 11/14/2019

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Qucell SC220 20 Yes
Seowon Intech SLC-120T 20 No
Seowon Intech SLC-120T 20 No
Gemtek WLTGG-122 Cat.1 20 No
Gemtek WLTMS-110 Cat.6 20 No
Seowon Intech SLC-150T 20 No
Seowon Intech SLC-150T 20 No
Gemtek WLTFGT-145ACN C 20 No
Gemtek WLTFSM-136 Cat6 20 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Ahsan Naim
Title of Applicant (if any): VP Technology
Date: 2019-03-12 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Henderson Nevada North  36  1  47 West  114  58  10 4.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:   65.00
(b) Orientation in horizontal plane:   10.00
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3550.00000000-3700.00000000 MHz FX 125.000000 mW 400.000000 mW P 0.00040000 % 20M0W7D LTE-TDD

18322

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC