Union Pacific Railroad Company

0385-EX-ST-2010

Status: Grant Expired Due to New License

WE9XMX
2010-08-17

Documents and Communications: [refresh]

DescriptionCategoryDate
E-Mail generated [Aug 3, 2010]Correspondence2010-08-03
Incoming generated [Aug 3, 2010]Correspondence2010-08-03
Grant E-mail Notification generated [Aug 18, 2010]Correspondence2010-08-18
Antenna structure sketchImages2010-07-28
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Union Pacific Railroad Company

Address
Attention: Ed Hollingsworth
Street Address: 1400 Douglas St
P.O. Box:
City: Omaha
State: NE
Zip Code: 68179
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Hollingsworth
First Name: Ed
Title: Sr Director, Wireless Engineering
Phone Number: 402.544.5464

Explanation
Please explain in the area below why an STA is necessary:
As a response to the Rail Safety Improvement Act of 2008, we are developing a Positive Train Control (PTC) system based on 220 MHz communications. The radio for this system is also under development. We need to characterize propagation and coverage of the radio system, but have no type accepted radio. We can adapt a similar radio to the 220 MHz band, but it would not have an equipment authorization.

Purpose of Operation
Please explain the purpose of operation:  To conduct drive testing and RF propagation analysis. The operation wouold be to mount temporary 220 MHz transmitters at selected locations, using power and modulations similar to those planned for the final system. We would then do drive tests with a suitable receiver to determine actual coverage and propagation characteristics.

Information
Callsign: WE9XMX
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 08/18/2010
Operation End Date: 02/17/2011

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Meteorcomm Communications 6200 1 Yes
Rhode & Schwartz SMBV100A 1 No
Rhode & Schwartz BBA100 1 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Edwin L. Hollingsworth
Title of Applicant (if any): Sr Director, Wireless Engineering
Date: 2010-07-28 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Taylor Junction California North  34  3  45 West  118  13  24 48.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   Yes
(a) Overall height above ground to tip of antenna in meters:   18.30
(b) Elevation of ground at antenna site above mean sea level in meters:   88.00
(c) Distance to nearest aircraft landing area in kilometers:   16.50
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft: None known
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 220.72500000-220.75000000 MHz FX 50.000000 W 158.000000 W P 25K0GXD 16 kBaud

14973