The Boeing Company

0301-EX-ST-2020

Status: Pending


2020-02-19

Filing Notes:

DescriptionDate
The purpose of modification is to add stop buzzers.2018-06-04

Documents and Communications: [refresh]

DescriptionCategoryDate
E-Mail generated [Feb 19 2020]Correspondence2020-02-19
Confidential RequestText Documents2020-02-19
Technical DescriptionText Documents2020-02-19
Operational DescriptionText Documents2020-02-19
E-Mail generated [Mar 16 2020]Correspondence2020-03-16
Dismissal Without Prejudice generated [Mar 31 2020]Correspondence2020-03-31
Dismiss E-mail Notification generated [Apr 6 2020]Correspondence2020-04-06
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  The Boeing Company

Address
Attention: Freq Mgt Svcs M/C: 1K-105
Street Address:
P.O. Box: 3707
City: Seattle
State: WA
Zip Code: 98124-2207
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Lindsay, SR
First Name: Allen
Title: Frequency Manager
Phone Number: 425-237-9168

Explanation
Please explain in the area below why an STA is necessary:
ESM lab Testing.

Purpose of Operation
Please explain the purpose of operation:  ESM lab Testing.

Information
Callsign:
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 03/19/2020
Operation End Date: 09/19/2020

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Agilent 8267D 1 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Ronald E Center
Title of Applicant (if any): Manager
Date: 2020-02-19 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Seattle Washington North  47  30  55 West  122  17  38
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 630.00000000- MHz FX N/A 15.000000 W P 0.00100000 % 1K00N0N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 720.00000000- MHz FX N/A 20.000000 W P 0.00100000 % 1K00N0N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 898.00000000- MHz FX N/A 20.000000 W P 0.00100000 % 1K00N0N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1122.00000000- MHz FX N/A 20.000000 W P 0.00100000 % 1K00N0N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1333.00000000- MHz FX N/A 1.000000 W P 0.00100000 % 1K00N0N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 5550.00000000- MHz FX N/A 42.000000 W P 0.00100000 % 1K00N0N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 6335.00000000- MHz FX N/A 25.000000 W P 0.00100000 % 1K00N0N

23105

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC