The Boeing Company

0236-EX-ST-2021

Status: Pending

N/A
2021-02-18

Documents and Communications: [refresh]

DescriptionCategoryDate
Technical DescriptionPre Coordination Document2021-02-18
E-Mail generated [Feb 19 2021]Correspondence2021-02-19
Updated Technical DescriptionPre Coordination Document2021-02-19
Updated Technical DescriptionPre Coordination Document2021-02-19
Grant E-mail Notification generated [Mar 3 2021]Correspondence2021-03-03
E-Mail generated [Feb 19 2021]Correspondence2021-02-19
Grant E-mail Notification generated [Mar 3 2021]Correspondence2021-03-03
Technical DescriptionPre Coordination Document2021-02-18
Updated Technical DescriptionPre Coordination Document2021-02-19
Updated Technical DescriptionPre Coordination Document2021-02-19
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  The Boeing Company

Address
Attention: Global Spectrum Management, MC 2T-22
Street Address:
P.O. Box: 3707
City: Seattle
State: WA
Zip Code: 98124-2207
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Camp
First Name: Benjamin
Title: Spectrum Manager
Phone Number: 314-365-2370

Explanation
Please explain in the area below why an STA is necessary:
A STA is necessary for the immediate need to begin testing in order to assist with future operations planning based on immediate results.

Purpose of Operation
Please explain the purpose of operation:  To support the operation of The Boeing Company's Foreign Object Debris (FOD) prototype system.

Information
Callsign: WR9XPZ
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 03/30/2021
Operation End Date: 09/30/2021

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
The Boeing Company Prototype 1 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Joel D. Thorsheim
Title of Applicant (if any): Manager, Global Spectrum Management
Date: 2021-02-18 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Ridley Park Pennsylvania North  39  51  39 West  75  19  10 1.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   Yes
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 75.00000000-85.00000000 GHz FX 100.000000 mW 100.000000 mW N0N

13688

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC