Southern Communications Services Inc d/b/a Southern Linc

1189-EX-ST-2019

Status: Pending

N/A
2019-06-26
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Southern Communications Services Inc d/b/a Southern Linc

Address
Attention: John D. Logan
Street Address: 4601 Southlake Parkway - Suite 150
P.O. Box:
City: Hoover
State: AL
Zip Code: 35244
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Austin
First Name: Shane
Title: Engineer
Phone Number: 205-257-6900

Explanation
Please explain in the area below why an STA is necessary:
Please see the attached exhibit.

Purpose of Operation
Please explain the purpose of operation:  To conduct technical trials to evaluate the performance and capabilities of 3.5 GHz CBRS spectrum to support critical electric and gas utility communications applications Please see the attached exhibit.

Information
Callsign: WO9XUT
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 07/10/2019
Operation End Date: 12/31/2019

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Ericsson Radio 2208 2 No
Google Pixel 3 G013A 200 No
Telit LM960 200 No
Sierra 7511 200 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): John Logan
Title of Applicant (if any): Senior Engineer
Date: 2019-06-26 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Birmingham Alabama North  33  31  4 West  86  48  48 12.90
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:   61.00
(b) Orientation in horizontal plane:   190.00
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:   18.70
(b) Elevation of ground at antenna site above mean sea level in meters:   181.70
(c) Distance to nearest aircraft landing area in kilometers:   5.60
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft: The facility will operate from an existing building with no increase in overall height. Additionally, there are other buildings between the antenna structure and the nearest airport.
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3550.00000000-3650.00000000 MHz FX 20.000000 W 50.000000 W P 0.00040000 % 10M0F9W LTE-TDD

City State Latitude Longitude Mobile Radius of Operation
Leeds Alabama North  33  31  57 West  86  41  14 12.90
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:   61.00
(b) Orientation in horizontal plane:   300.00
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   Yes
(a) Overall height above ground to tip of antenna in meters:   49.20
(b) Elevation of ground at antenna site above mean sea level in meters:   308.50
(c) Distance to nearest aircraft landing area in kilometers:   15.90
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft: The facilitiy will operate from an existing antenna structure with no increase in overall height,
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3550.00000000-3650.00000000 MHz FX 20.000000 W 50.000000 W P 0.00040000 % 10M0F9W LTE-TDD

20116

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC