Sony Corporation

0373-EX-ST-2017

Status: Grant Expired Due to New License

WL9XBL
2017-04-03

Documents and Communications: [refresh]

DescriptionCategoryDate
E-Mail generated [Mar 24 2017]Correspondence2017-03-24
E-Mail generated [Mar 30 2017]Correspondence2017-03-30
Incoming generated [Mar 24 2017]Correspondence2017-03-24
Grant E-mail Notification generated [Apr 3 2017]Correspondence2017-04-03
E-Mail generated [Mar 24 2017]Correspondence2017-03-24
E-Mail generated [Mar 30 2017]Correspondence2017-03-30
Incoming generated [Mar 24 2017]Correspondence2017-03-24
Grant E-mail Notification generated [Apr 3 2017]Correspondence2017-04-03
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Sony Corporation

Address
Attention: Ryo Takata, Quality Center
Street Address: 1-7-1 Konan, Minato-ku
P.O. Box:
City: Tokyo
State:
Zip Code: 108-0075
Country: Japan
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Fay
First Name: Luke
Title: Sr. Mgr. Technology Standards
Phone Number: 858 705 5435

Explanation
Please explain in the area below why an STA is necessary:
Demonstration of ATSC 3.0 physical layer operation with video at 2017 NAB Show

Purpose of Operation
Please explain the purpose of operation:  ATSC 3.0 emissions as defined in ATSC A/321 and A/322 standards will be used to transfer IP packets between a transmitter and receiver within the ATSC booth at the 2017 NAB Show.

Information
Callsign: WL9XBL
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 04/21/2017
Operation End Date: 04/28/2017

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
DekTec DTU-315 1 No
Mini-Circuits ZHL-1010-75+ 2 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Luke Fay
Title of Applicant (if any):
Date: 2017-03-23 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Las Vegas Nevada North  36  7  55 West  115  9  6 Las Vegas Convention Center, Grand Hallway, Las Vegas, NV 0.10
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 506.00000000-512.00000000 MHz MO 150.000000 uW 150.000000 uW M 0.25000000 % 6M00F2F ATSC A/321, A/322

14110

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC