Raytheon IDS

0997-EX-ST-2015

Status: Grant Expired Due to New License

WI9XZT
2015-10-22

Documents and Communications: [refresh]

DescriptionCategoryDate
E-Mail generated [Sep 14 2015]Correspondence2015-09-14
Grant E-mail Notification generated [Oct 23 2015]Correspondence2015-10-23
License update LetterPost Grant Documents2016-01-14
Mission DeacriptionText Documents2015-09-10
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Raytheon IDS

Address
Attention: Karen Dyberg
Street Address: 1001 Boston Post Rd. MS 3-1-3355
P.O. Box:
City: Marlborough
State: MA
Zip Code: 01752
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Dyberg
First Name: Karen
Title: Program Spectrum Manager
Phone Number: 508-490-2723

Explanation
Please explain in the area below why an STA is necessary:
The ESSM TM will be used to downlink test information for the ESSM section of the AMRAAM-ER missile. This telemetry data is required to assess the performance of the AMRAAM-Extended Range missile being developed by Raytheon. This demonstration test event is being conducted at White Sands Missile Range at the West Center-50 (WC-50) site.

Purpose of Operation
Please explain the purpose of operation:  To develop an extended-range AMRAAM, integrate with NASAMS and AESA Sentinel and demonstrate with 2 live firings.

Information
Callsign: WI9XZT
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 11/16/2015
Operation End Date: 12/16/2015

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Aero Space Group AN/DKT 88A 2 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): John F. Adams
Title of Applicant (if any): Program Spectrum Manager
Date: 2015-09-10 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
WSMR New Mexico North  33  8  48 West  106  26  16 30.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 2204.50000000-2231.50000000 MHz FX 5.000000 W 5.000000 W P 6M00M1D