Raytheon IDS

0971-EX-ST-2014

Status: Grant Expired Due to New License

WH9XYS
2014-11-10

Documents and Communications: [refresh]

DescriptionCategoryDate
Grant E-mail Notification generated [Nov 11 2014]Correspondence2014-11-11
LPR2 ExhibitText Documents2014-10-23
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Raytheon IDS

Address
Attention: Karen Dyberg
Street Address: 528 Boston Post Road
P.O. Box:
City: Sudbury
State: MA
Zip Code: 01776
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Dyberg
First Name: Karen
Title: Spectrum Management/RF Safety
Phone Number: 978-440-4022

Explanation
Please explain in the area below why an STA is necessary:
The Raytheon Low Power Radar 2 (LPR2) array is planned to be tested at the NTIA-ITS Table Mountain Antenna Fields Site in Boulder, Co, over the period of November 17, 2014 - May 17, 2015. The purpose of this request for Special Temporary Authorization is to test array compliance to RF performance requirements in a relevant environment. The FAA coordination serial number is NG T140454.

Purpose of Operation
Please explain the purpose of operation:  To test prototype radar arrays. Frequency authorization is being requested for the period of November 17, 2014 - May 17, 2015 in X-band at frequencies between 9.0 - 9.2 GHz, 9.3 - 9.5 GHz, and at 9.55 - 9.65 GHz, in order to test prototype radar arrays in a relevant environment. Outdoor testing, across multiple frequencies as noted above is required to assess hardware compliance with requirements.

Information
Callsign: WH9XYS
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 11/17/2014
Operation End Date: 05/17/2015

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Raytheon LPR2 6 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Karen Dyberg
Title of Applicant (if any): Spectrum Management/RF Safety
Date: 2014-10-23 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Longmont Colorado North  40  7  58 West  105  14  42 2.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9.00000000-9.20000000 GHz FX 160.000000 W 954.000000 kW P 4M70Q3N Linear FM Chirp
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9.00000000-9.20000000 GHz FX 160.000000 W 954.000000 kW P 7M10Q3N Non-Linear FM chirp
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9.30000000-9.50000000 GHz FX 160.000000 W 954.000000 kW P 4M70Q3N Linear FM chirp
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9.30000000-9.50000000 GHz FX 160.000000 W 954.000000 kW P 7M10Q3N Non-Linear FM chirp
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 9.55000000-9.65000000 GHz FX 160.000000 W 954.000000 kW P 4M70Q3N Linear FM chirp
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 9.55000000-9.65000000 GHz FX 160.000000 W 954.000000 kW P 7M10Q3N Non-Linear FM chirp

22408

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC