Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Raytheon IDS

Address
Attention: Karen Dyberg
Street Address: 1001 Boston Post Road
P.O. Box:
City: Marlborough
State: MA
Zip Code: 01752
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Dyberg
First Name: Karen
Title: Spectrum Manager
Phone Number: 505-490-2723

Explanation
Please explain in the area below why an STA is necessary:
This Special Temporary Authority (STA) is necessary because X-Band transmission is required in order to perform measurements of propagation loss in the directions of interest. Measurement under typical conditions is required because the land in the directions of interest is too complex and variable for reliable modeling of the over land propagation loss. The next stage of developmental testing is dependent on the results of this experiment and a speedy result is required to maintain schedule.

Purpose of Operation
Please explain the purpose of operation:  To measure X-band propagation loss over land. The purpose of this testing is to measure X-band propagation loss over land from the Raytheon test site at 50 Bush Hill Road, Pelham NH, to two or more receiver sites of interest. Technical Synopsis: • Spectrum needed: 8.5 – 8.99 GHz and 9.21 – 10 GHz • Power levels requested: 419 kW peak ERP • Location of use: 50 Bush Hill Rd., Pelham, NH • Direction of radiation: 177.4, 183.3, 44.5 or 194.5 degrees from True North Azimuth; 0.0 degrees Elevation • Stop buzzer contacts: Thomas Lulsdorf (cell 978-815-9514), Karen Dyberg (cell 508-450-9236)

Information
Callsign: WL9XGE
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 05/24/2017
Operation End Date: 11/15/2017

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Applied Systems Engineering 174X 1 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Karen Dyberg
Title of Applicant (if any): Spectrum Manager
Date: 2017-05-05 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Pelham New Hampshire North  42  44  15 West  71  21  17
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   Yes
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9210.00000000-10000.00000000 MHz FX 2173.000000 W 419.000000 kW P 207MQ3N Linear FM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9210.00000000-10000.00000000 MHz FX 2173.000000 W 419.000000 kW P 27M3Q3N Linear FM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9210.00000000-10000.00000000 MHz FX 2173.000000 W 419.000000 kW P 7M30Q3N Linear FM