Special Temporary Authority application - Applicant Name
Name of Applicant:
Raytheon IDS
Special Temporary Authority application - Best Contact
First Name:
Karen
Last Name:
Dyberg
Phone Number:
505-490-2723
Title:
Spectrum Manager
Special Temporary Authority application - Certification
Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2017-05-05 00:00:00.0
Signature of Applicant (Authorized person filing form):
Karen Dyberg
Title of Applicant (if any):
Spectrum Manager
Special Temporary Authority application - Explanation
Please explain in the area below why an STA is necessary:
This Special Temporary Authority (STA) is necessary because X-Band transmission is required in order to perform measurements of propagation loss in the directions of interest. Measurement under typical conditions is required because the land in the directions of interest is too complex and variable for reliable modeling of the over land propagation loss. The next stage of developmental testing is dependent on the results of this experiment and a speedy result is required to maintain schedule.
Special Temporary Authority application - Information
Callsign:
WL9XGE
Class of Station:
FX
Nature of Service:
Experimental
Special Temporary Authority application - Initial values - Applicant Name
Name of Applicant:
IDS Raytheon
Special Temporary Authority application - Initial values - Purpose of Operation
Please explain the purpose of operation:
The purpose of this testing is to measure X-band propagation loss over land from the Raytheon test site at 50 Bush Hill Road, Pelham NH, to two or more receiver sites of interest. Technical Synopsis: • Spectrum needed: 8.5 – 8.99 GHz and 9.21 – 10 GHz • Power levels requested: 419 kW peak ERP • Location of use: 50 Bush Hill Rd., Pelham, NH • Direction of radiation: 177.4, 183.3, 44.5 or 194.5 degrees from True North Azimuth; 0.0 degrees Elevation • Stop buzzer contacts: Thomas Lulsdorf (cell 978-815-9514), Karen Dyberg (cell 508-450-9236)
Special Temporary Authority application - Manufacturer
Equipment 1 Experimental
No
Equipment 1 Manufacturer
Applied Systems Engineering
Equipment 1 Model Number
174X
Equipment 1 No. Of Units
1
Special Temporary Authority application - Purpose of Operation
Please explain the purpose of operation:
To measure X-band propagation loss over land. The purpose of this testing is to measure X-band propagation loss over land from the Raytheon test site at 50 Bush Hill Road, Pelham NH, to two or more receiver sites of interest. Technical Synopsis: • Spectrum needed: 8.5 – 8.99 GHz and 9.21 – 10 GHz • Power levels requested: 419 kW peak ERP • Location of use: 50 Bush Hill Rd., Pelham, NH • Direction of radiation: 177.4, 183.3, 44.5 or 194.5 degrees from True North Azimuth; 0.0 degrees Elevation • Stop buzzer contacts: Thomas Lulsdorf (cell 978-815-9514), Karen Dyberg (cell 508-450-9236)
Special Temporary Authority application - Requested Period of Operation