Raytheon Company

1051-EX-ST-2013

Status: Grant Expired Due to New License

WH9XCC
2013-12-02

Documents and Communications: [refresh]

DescriptionCategoryDate
Grant E-mail Notification generated [Dec 3 2013]Correspondence2013-12-04
FAA Coordination confirmationPost Grant Documents2014-02-13
Attach 1 Narrative DetailsText Documents2013-11-14
Attach 2 Antenna Site InfoText Documents2013-11-14
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Raytheon Company

Address
Attention: Richard Haycook
Street Address: 50 Apple Hill Drive
P.O. Box:
City: Tewksbury
State: MA
Zip Code: 01876
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Browarek
First Name: Sharmeen
Title: Systems Engineer
Phone Number: (978)-604-4314

Explanation
Please explain in the area below why an STA is necessary:
STA Explanation: The prototype noise antenna test kit is planned to be operated at the Raytheon Test Facility in Pelham, NH over the period of December 6th, 2013 – June 6th, 2014. The purpose of this request for Special Temporary Authorization is to integrate our proof of design before presenting it to the customer. Test Summary: An experimental license is required to integrate a prototype radar diagnostic tool before presenting to our customer. Starting in December 2013, we will be using a noise source generator with a digital band pass filter to limit the noise source within the 5250 – 5850 MHz band. The source will be a continuous wave source operating at a maximum 2W output. The calculations for the power output, cable losses, etc can be found below. The noise source will be emitted from a horn mounted atop a 9 m mast, connected to a 50 foot cable. It will be on just long enough for the radar to receive the signal and run the test to evaluate the radar health. The radar under test will be in receive mode only.

Purpose of Operation
Please explain the purpose of operation:  To test and develop a C-Band noise antenna test kit. Frequency authorization is requested for the period of December 6th, 2013– June 6th, 2014 in the 5250 – 5850 MHz band in order to develop a C-Band noise antenna test kit. The kit will be a diagnostic tool, allowing us to troubleshoot the radar when issues arise in field. The target radar will be in receive-only mode during these tests. Integration will take place at the Raytheon Test Facility, Pelham, NH. The customer demonstration is planned to take place at another location (TBD).

Information
Callsign: WH9XCC
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 12/06/2013
Operation End Date: 05/06/2014

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Noise Com Incorporated NC9282 1 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Richard A. Haycook
Title of Applicant (if any): HQ IDS Spectrum Manager.RF Safety
Date: 2013-11-14 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Pelham New Hampshire North  42  44  14 West  71  21  14
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   Yes
(a) Width of beam in degrees at the half-power point:   34.00
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:   90.00
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   Yes
(a) Overall height above ground to tip of antenna in meters:   9.20
(b) Elevation of ground at antenna site above mean sea level in meters:   128.00
(c) Distance to nearest aircraft landing area in kilometers:   12.90
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft: None
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 5250.00000000-5600.00000000 MHz FX 2.000000 W 7.590000 W P N0N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 5650.00000000-5850.00000000 MHz FX 2.000000 W 7.590000 W P N0N

17046

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC