Raytheon Company

0668-EX-ST-2011

Status: Grant Expired Due to New License

WE9XWR
2012-01-05

Documents and Communications: [refresh]

DescriptionCategoryDate
E-Mail generated [Nov 28, 2011]Correspondence2011-11-28
Incoming generated [Nov 28, 2011]Correspondence2011-11-28
Grant E-mail Notification generated [Jan 9 2012]Correspondence2012-01-09
Galvonston TXText Documents2011-12-01
Map showing Air Craft Orbit AreaText Documents2011-11-28
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Raytheon Company

Address
Attention: Clarence Banks
Street Address: 2000 E. El segundo Blvd
P.O. Box: 902
City: El Segundo
State: CA
Zip Code: 90245-0902
Country: United States
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Banks
First Name: Clarence
Title: Spectrum Manager
Phone Number: 310+616-9242

Explanation
Please explain in the area below why an STA is necessary:
Raytheon needs the STA to conduct ground and airborne test and evaluation of design modifications and mode implementations to the APY-10 Radar. This product is a direct commercial sale between Raytheon and Boeing, for an international end user. The Stop Buzzer is Henry Shipes at 1.214.578.7169

Purpose of Operation
Please explain the purpose of operation:  Raytheon needs the STA to conduct ground and airborne test and evaluation of design modifications and mode implementations to the APY-10 Radar. This product is a direct commercial sale between Raytheon and Boeing, for an international end user. The Stop Buzzer is Henry Shipes at 1.214.578.7169

Information
Callsign: WE9XWR
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 01/01/2012
Operation End Date: 06/30/2012

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Raytheon AN/APY-10 (IND) 1 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Clarence Banks
Title of Applicant (if any): Spectrum Manager
Date: 2011-10-27 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Galveston Texas North  29  10  59 West  94  25  46 Galveston, TX 160.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft: Then FLT test elevation will be no more than 12K feet.
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9350.00000000-10000.00000000 MHz MO 50000.000000 W 60.800000 MW P 10M0Q3N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9350.00000000-10000.00000000 MHz MO 50000.000000 W 60.800000 MW P 117MQ3N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9350.00000000-10000.00000000 MHz MO 50000.000000 W 60.800000 MW P 537MQ3N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9350.00000000-10000.00000000 MHz MO 50000.000000 W 60.800000 MW P 607MQ3N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9350.00000000-10000.00000000 MHz MO 50000.000000 W 60.800000 MW P 650MQ3N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9350.00000000-10000.00000000 MHz MO 50000.000000 W 60.800000 MW P 7M03P0N

22239

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC