Northrop Grumman Systems Corporation

0797-EX-ST-2016

Status: Grant Expired Due to New License

WI9XGT
2016-08-15

Documents and Communications: [refresh]

DescriptionCategoryDate
Grant E-mail Notification generated [Aug 15 2016]Correspondence2016-08-15
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Northrop Grumman Systems Corporation

Address
Attention: DS LAW PLLC
Street Address: 1629 K St NW Ste 300
P.O. Box:
City: Washington
State: DC
Zip Code: 20006-1631
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Siddall
First Name: David
Title: outside counsel
Phone Number: 202-559-4690

Explanation
Please explain in the area below why an STA is necessary:
An STA is necessary to test and demonstrate improvements to Tactical Operations Center capabilities utilizing wireless communications.

Purpose of Operation
Please explain the purpose of operation:  The purpose of operation is to test improved Tactical Operations Center capabilities using radio spectrum for wireless connections.

Information
Callsign: WI9XGT
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 06/22/2016
Operation End Date: 11/22/2016

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Harris RF-7800-MP 4 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Greg Romanski
Title of Applicant (if any): Land Forces and Protective Systems SEIT Manager
Date: 2016-05-29 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Madison Alabama North  34  36  8 West  86  45  14 Madison, AL 1.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 904.50000000- MHz MO N/A 10.000000 W P 1M20D7D Amplitude and Angle
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 904.50000000- MHz MO N/A 10.000000 W P 5M00D7D Amplitude and Angle
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 907.00000000- MHz MO N/A 10.000000 W P 1M20D7D Amplitude and Angle
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 907.00000000- MHz MO N/A 10.000000 W P 5M00D7D Amplitude and Angle
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 909.50000000- MHz MO N/A 10.000000 W P 1M20D7D Amplitude and Angle
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 909.50000000- MHz MO N/A 10.000000 W P 5M00D7D Amplitude and Angle

City State Latitude Longitude Mobile Radius of Operation
Huntsville Alabama North  34  36  43 West  86  46  17 Huntsville, AL 1.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 904.50000000- MHz MO N/A 10.000000 W P 1M20D7D Amplitude and Angle
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 904.50000000- MHz MO N/A 10.000000 W P 5M00D7D Amplitude and Angle
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 907.00000000- MHz MO N/A 10.000000 W P 1M20D7D Amplitude and Angle
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 907.00000000- MHz MO N/A 10.000000 W P 5M00D7D Amplitude and Angle
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 909.50000000- MHz MO N/A 10.000000 W P 1M20D7D Amplitude and Angle
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 909.50000000- MHz MO N/A 10.000000 W P 5M00D7D Amplitude and Angle

34469

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC