Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Nokia Siemens Networks

Address
Attention: Cecily Cohen
Street Address: 1401 K St. NW Suite 450
P.O. Box:
City: Washington
State: DC
Zip Code: 20005
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Clark
First Name: JC
Title: Project Director
Phone Number: +14252463287

Explanation
Please explain in the area below why an STA is necessary:
NSN needs access to AWS spectrum to conduct interoperability testing of its 1.7/1.9/2.1 GHz UMTS/GSM handsets and 2G-3G core network equipment. Testing will also include the transmission of voice, video, and data using UMTS technology and equipment for Advanced Wirelss Services (AWS)

Purpose of Operation
Please explain the purpose of operation:  The additional AWS UMTS overlay needs to be integrated with the exisitintg T-Mobile PCS GSM wireless network. The additional AWS UMTS overlay needs to be integrated with the exisitintg T-Mobile PCS GSM wireless network. The operational testing will include end to end statistical and drive test verification of all aspects of both T-Mobile networks

Information
Callsign: WD9XAN
Class of Station: FX MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 09/12/2007
Operation End Date: 03/12/2008

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Nokia Nokia Flexi|SGH 20 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Cecily Cohen
Title of Applicant (if any): Director, Government and Industry Affairs
Date: 2007-08-08 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Frisco Texas North  33  6  27 West  96  49  19 Frisco (COLLIN), TX 5.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1745.00000000-1750.00000000 MHz MO 0.234000 W 0.250000 W P 5M00F9W QPSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2145.00000000-2150.00000000 MHz FX 40.000000 W 794.000000 W P 5M00F9W QPSK