NASCAR Productions, LLC

0983-EX-ST-2015

Status: Denied/Dismissed


2015-10-08

Documents and Communications: [refresh]

DescriptionCategoryDate
Dismissal Without Prejudice generated [Oct 8 2015]Correspondence2015-10-08
Narrative Explanation of Operation and Frequency CoordinationText Documents2015-09-02
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  NASCAR Productions, LLC

Address
Attention: Bill Stafford
Street Address: 550 South Caldwell Street, Suite 500
P.O. Box:
City: Charlotte
State: MD
Zip Code: 28202
Country: United States
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Imlay
First Name: Christopher
Title: Counsel
Phone Number: 3013845525

Explanation
Please explain in the area below why an STA is necessary:
Testing of a digital data telemetry system for race car operations. This is a new system being tested for the second time. Licensed operation will be considered (in different frequency bands) if the system tests are successful.

Purpose of Operation
Please explain the purpose of operation:  Testing of a digital data telemetry system for race car operations. See also Narrative and Frequency Coordination Exhibit attached to this application. Please Note: Coordination with AFTRCC is being applied for contemporaneously and when received such coordination confirmation will be submitted as an amendment to this application.

Information
Callsign:
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 10/01/2015
Operation End Date: 10/03/2015

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
various various 6 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Bill Stafford
Title of Applicant (if any): Director, Facility and Studio Operations
Date: 2015-09-02 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Georgia North  34  8  47 West  83  49  13 Road Atlanta Motor Speedway, Braselton, GA 5.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2360.00000000-2390.00000000 MHz MO 1.000000 W 5.000000 W P 10M0D7W

14457

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC