MIT Lincoln Laboratory

1411-EX-ST-2021

Status: Pending

N/A
2021-08-31
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  MIT Lincoln Laboratory

Address
Attention: Joseph Fischetti
Street Address: 244 Wood St
P.O. Box:
City: Lexington
State: MA
Zip Code: 02421
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Martin
First Name: Carol
Title: Technical Staff
Phone Number: 781-981-1671

Explanation
Please explain in the area below why an STA is necessary:
The experiment will last four weeks. The period of operations will be 01 March – 31 March 2022.

Purpose of Operation
Please explain the purpose of operation:  The proposed experiment fulfills requirements for work supported by the Department of the Air Force under Air Force Contract No. FA8702-15-D-0001. The program is developing technology to improve the performance and protection of communication signals. MIT Lincoln Laboratory is developing a communications capability for the Department of Defense. In order to have a successful transition to the warfighter, the developed technology needs to be tested and demonstrated in air-to-air and air-to-ground flight tests. This STA will support a USAF demonstration to take place in March 2022 at Eglin AFB.

Information
Callsign:
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 03/01/2022
Operation End Date: 03/31/2022

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Anokiwave AWMF-0129 4 No
Ettus Research X310 4 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Joseph Fischetti
Title of Applicant (if any): Technical Staff
Date: 2021-08-31 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Florida North  30  29  10 West  86  30  16 100 km radius about 30 29 10 N 086 30 16 W 100.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   Yes
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   Yes
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 28.50000000-30.00000000 GHz MO 1.600000 mW 63.000000 W P 0.00100000 % 12M0G1D QPSK

14515