Lockheed Martin Corporation

1671-EX-ST-2020

Status: Pending

N/A
2020-10-26

Documents and Communications: [refresh]

DescriptionCategoryDate
E-Mail generated [Oct 26 2020]Correspondence2020-10-26
FAA CoordinationPre Coordination Document2020-10-26
FAA CoordinationPre Coordination Document2020-10-26
E-Mail generated [Oct 26 2020]Correspondence2020-10-26
Incoming generated [Oct 26 2020]Correspondence2020-10-26
E-Mail generated [Oct 27 2020]Correspondence2020-10-27
Incoming generated [Oct 27 2020]Correspondence2020-10-27
Grant E-mail Notification generated [Nov 6 2020]Correspondence2020-11-06
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Lockheed Martin Corporation

Address
Attention: Ryan N. Terry
Street Address: 2121 Crystal Drive, Suite 100
P.O. Box:
City: Arlington
State: VA
Zip Code: 22202
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Terry
First Name: Ryan
Title: Director, Regulatory Licensing & Policy
Phone Number: 703-413-5747

Explanation
Please explain in the area below why an STA is necessary:
Applicant seeks short-term authorization to conduct final functional checks of HC-130J aircraft prior to delivery to the U.S. Air Force. Short-term authorization is needed to meet a key milestone in the coming weeks. Operations are supported by U.S. Government contract FA8625-15-D-6591.

Purpose of Operation
Please explain the purpose of operation:  Spectrum authority required to support flight testing of HC-130J aircraft prior to delivery. Authority will enable IFF transmitter use in civil modes (3A/C/S) for air traffic control functions. The use of this frequency has been prior coordinated with the FAA. Operations will not exceed 25,000 feet AGL.

Information
Callsign: WR9XGP
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 11/07/2020
Operation End Date: 02/07/2021

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Raytheon APX-119 RT1861 1 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Ryan Neels Terry
Title of Applicant (if any): Director, Regulatory Licensing & Policy
Date: 2020-10-26 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Greenville South Carolina North  34  50  50 West  82  20  54 Greenville, SC 370.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1090.00000000- MHz MO 600.000000 W 600.000000 W P 5M60M1D
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1090.00000000- MHz MO 600.000000 W 600.000000 W P 7M30M1D

16014