Kymeta Corporation

1151-EX-ST-2013

Status: Grant Expired Due to New License

WH9XEP
2014-01-15

Documents and Communications: [refresh]

DescriptionCategoryDate
Grant E-mail Notification generated [Jan 16 2014]Correspondence2014-01-16
POC ChangeText Documents2014-05-19
Kymeta 24 GHz Terrestrial TestText Documents2013-12-20
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Kymeta Corporation

Address
Attention: Michael Hansen
Street Address: 12277 134th Court, NE, Suite 100
P.O. Box:
City: Redmond
State: WA
Zip Code: 98052
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Kirchoff
First Name: Kenny
Title: Principal Engineer
Phone Number: 425-681-3802

Explanation
Please explain in the area below why an STA is necessary:
Kymeta is developing a microwave antenna technology that could significantly improve performance and lower costs in commercial deployment. Grant of the STA will allow Kymeta to undertake testing and technical demonstrations.

Purpose of Operation
Please explain the purpose of operation:  To test microwave antenna technology on point-to-point terrestrial links. Kymeta seeks to test its microwave antenna technology on point-to-point terrestrial links. Both ends of the point-to-point terrestrial links will be located within a one-mile radius of Kymetas headquarters in Redmond, Washington.

Information
Callsign: WH9XEP
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 02/01/2014
Operation End Date: 07/31/2014

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Kymeta Corporation WIPAS-2 24 GHz 1 Yes
Japan Radio Company rc31100 TDD 1 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Robert S. Koppel
Title of Applicant (if any): Counsel
Date: 2013-12-20 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Redmond Washington North  47  42  35 West  122  9  46 1.70
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   Yes
(a) Width of beam in degrees at the half-power point:   1.50
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 24.00000000-24.25000000 GHz FX 0.050000 W 316.000000 W P 28M0W7D Digital Info Stream
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 24.00000000-24.25000000 GHz FX 0.050000 W 316.000000 W P 56M0W7D Digital Info Stream

16314

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC