Intel Corporation

0180-EX-ST-2005

Status: Grant Expired Due to New License

WC9XDR
2005-04-21
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Intel Corporation

Address
Attention: John Hammond
Street Address: 2111 NE 25th Ave, M/S JF2-58
P.O. Box:
City: Hillsboro
State: OR
Zip Code: 97124
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: COKENIAS
First Name: THOMAS
Title: Agent for Intel
Phone Number: 650 726 1263

Explanation
Please explain in the area below why an STA is necessary:
Description Intel will be creating a web-cast at its’ headquarters which will be used for other upcoming events. The intent is to ‘film’ various technologies which utilize the new WiMAX component Intel will be launching at this time frame. Environment: Intel has developed a wireless chipset for IEEE 802.16 WiMax operation. In order to demonstrate the products conformance to the standards requirements and to test the products performance, a wireless communications channel is required. The product will be developed first for the Canadian and European markets which use the 3500 MHz band

Purpose of Operation
Please explain the purpose of operation:  Demonstrating a wireless chipset for IEEE 802.16 WiMax operation. Description Intel will be hosting a Press Event for its launch of the 5116 WiMax phy/mac silicon component. The event will take place in a large conference area within the hotel, indoors only. Environment: Indoors only, both end-points will be located in the same facility and room for this demonstration.

Information
Callsign: WC9XDR
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 04/11/2005
Operation End Date: 04/25/2005

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Alvarion Ltd. BreezeMAX 3500 3 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): THOMAS N COKENIAS
Title of Applicant (if any): AGENT for Intel Inc.
Date: 2005-04-04 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Reston Virginia North  38  57  31 West  77  21  33
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3.44625000-3.44925000 GHz FX 100.000000 mW 200.000000 mW M 0.00400000 % 3M25G1D QPSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3.44625000-3.44925000 GHz FX 100.000000 mW 200.000000 mW M 0.00400000 % 3M25W1D 64QAM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3.54625000-3.54925000 GHz FX 100.000000 mW 200.000000 mW M 0.00400000 % 3M25G1D QPSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3.54625000-3.54925000 GHz FX 100.000000 mW 200.000000 mW M 0.00400000 % 3M25W1D 64QAM

18867

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC