Toggle navigation
FCC.report
IBFS
ELS
FCC ID
Contact
About
FCC.report
›
ELS
›
Insitu
›
1216-EX-ST-2020
Insitu
1216-EX-ST-2020
Status: Pending
N/A
2020-08-05
Documents and Communications:
[
refresh
]
Description
Category
Date
E-Mail generated [Aug 5 2020]
Correspondence
2020-08-05
Incoming generated [Aug 5 2020]
Correspondence
2020-08-05
FAA Coordination
Pre Coordination Document
2020-08-05
Technical Description
Text Documents
2020-08-05
Grant E-mail Notification generated [Aug 19 2020]
Correspondence
2020-08-19
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY
Applicant Name
Name of Applicant:
Insitu
Address
Attention:
Ben Schreffler
Street Address:
118 East Columbia River Way
P.O. Box:
City:
Bingen
State:
WA
Zip Code:
98605
Country:
E-Mail Address:
[email protected]
Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:
Last Name:
Thorsheim
First Name:
Joe
Title:
Spectrum Manager
Phone Number:
425-234-4287
Explanation
Please explain in the area below why an STA is necessary:
To support UAS testing at the Pendleton UAS test range using the Scan Eagle 3 platform to operate a C-Band Command and Control link
Purpose of Operation
Please explain the purpose of operation:
The radio frequency equipment listed below will be used to support a C-Band command and control data link.
Information
Callsign:
WQ9XXQ
Class of Station:
FX MO
Nature of Service:
Experimental
Requested Period of Operation
Operation Start Date:
08/20/2020
Operation End Date:
02/15/2021
Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:
Manufacturer
Model Number
No. Of Units
Experimental
Freewave Technologies
MM2-M13
6
No
Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form):
Joel D. Thorsheim
Title of Applicant (if any):
Spectrum Manager, Spectrum Management
Date:
2020-08-05 00:00:00.0
Station Location
City
State
Latitude
Longitude
Mobile
Radius of Operation
Bingen
Washington
North 45 42 23
West 121 27 23
5.00
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
Yes
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane:
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
5060.00000000-5070.00000000 MHz
FX
1.000000 W 2.000000 W
M
230KF1D
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
5060.00000000-5070.00000000 MHz
FX
10.000000 W 13200.000000 W
M
230KF1D
City
State
Latitude
Longitude
Mobile
Radius of Operation
Pendleton
Oregon
North 45 41 21
West 118 50 32
100.00
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
Yes
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane:
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
5060.00000000-5070.00000000 MHz
FX
10.000000 W 13200.000000 W
M
230KF1D
City
State
Latitude
Longitude
Mobile
Radius of Operation
Pendleton
Oregon
North 45 41 21
West 118 50 32
Pendleton, OR. 15,000 Foot Maximum Flight Level
100.00
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
Yes
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane:
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
5060.00000000-5070.00000000 MHz
MO
1.000000 W 2.000000 W
M
230KF1D
25608
© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC