HERA Systems Incorporated

1781-EX-ST-2018

Status: Pending

N/A
2018-10-12

Documents and Communications: [refresh]

DescriptionCategoryDate
Technical DescriptionText Documents2018-10-12
Stop Buzzer DesignationText Documents2018-10-12
Operating Agency RequestText Documents2018-10-12
Orbital Debris Assessment ReportText Documents2018-10-12
E-Mail generated [May 9 2019]Correspondence2019-05-09
E-Mail generated [Oct 16 2018]Correspondence2018-10-16
E-Mail generated [Nov 2 2018]Correspondence2018-11-02
E-Mail generated [Nov 2 2018]Correspondence2018-11-02
E-Mail generated [Feb 1 2019]Correspondence2019-02-01
E-Mail generated [Apr 18 2019]Correspondence2019-04-18
E-Mail generated [Apr 26 2019]Correspondence2019-04-26
E-Mail generated [Jun 4 2019]Correspondence2019-06-04
E-Mail generated [Jun 6 2019]Correspondence2019-06-06
E-Mail generated [Jun 21 2019]Correspondence2019-06-21
E-Mail generated [Jun 27 2019]Correspondence2019-06-27
E-Mail generated [Jun 27 2019]Correspondence2019-06-27
E-Mail generated [Jul 1 2019]Correspondence2019-07-01
E-Mail generated [Jul 10 2019]Correspondence2019-07-10
Grant E-mail Notification generated [Aug 21 2019]Correspondence2019-08-21
Radiation Pattern Space X Band AntennaImages2019-05-30
Radiation Pattern Space C Band AntennaImages2019-05-30
Radiation Pattern Space Iridium DiagramImages2019-05-30
Radiation Pattern Space X Band Ant Rev 1Images2019-07-27
EMC AnalysisText Documents2019-08-01
Stop Buzzer R1Text Documents2019-05-07
NOAA CRSRA LicenseText Documents2019-06-23
NOAA License AwardedText Documents2019-05-07
Description of ResearchText Documents2018-11-26
Technical Description R1Text Documents2018-10-28
Technical Description R2Text Documents2019-05-07
Description of Research R1Text Documents2019-05-07
ITU Cost Recovery Letter R1Text Documents2019-05-07
1HOPSAT-1 ITU API Cover LetterText Documents2018-11-27
1HOPSAT-1 ITU Cost Recovery LetterText Documents2018-11-27
Operating Agency Symbol Request R1Text Documents2019-05-07
Orbital Debris Assessment Report R1Text Documents2019-05-07
Discussion of Ground Station SupportText Documents2019-05-09
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  HERA Systems Incorporated

Address
Attention: David D. Squires
Street Address: 7013 Realm Drive, Suite B
P.O. Box:
City: San Jose
State: CA
Zip Code: 95119
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Miller
First Name: Michael
Title: Licensing Coordinator
Phone Number: 4153853842

Explanation
Please explain in the area below why an STA is necessary:
This STA License is necessary to authorize radio transmission of data from the 1HOPSat-TD satellite.

Purpose of Operation
Please explain the purpose of operation:  Downlink data from 1HOPSat-TD experiment.

Information
Callsign: WP9XCA
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 08/01/2019
Operation End Date: 01/30/2020

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Syrlinks EWC 27 1 No
Doodle Labs NM-5500-1F 1 No
Iridium 9602-N 1 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Michael L Miller
Title of Applicant (if any): Licensing Coordinator
Date: 2018-10-12 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
NONGEOSTATIONARY Space Station North      West      LEO 555 km X Band
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   Yes
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 8.16000000-8.34000000 GHz MO 2.000000 W 28.600000 W M 0.00001000 % 100MG1D OQPSK

City State Latitude Longitude Mobile Radius of Operation
NONGEOSTATIONARY Space Station North      West      LEO 555 km C Band
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   Yes
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 5.74500000- GHz MO 0.800000 W 3.700000 W M 0.00050000 % 20M0G1D PSK

City State Latitude Longitude Mobile Radius of Operation
NONGEOSTATIONARY Space Station North      West      LEO 555 km Iridium
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   Yes
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1618.72500000-1626.50000000 MHz MO 1.000000 W 1.880000 W P 0.00050000 % 41K7Q7W DEQPSK

24745

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC