Ericsson

0199-EX-ST-2021

Status: Pending


2021-02-10

Filing Notes:

DescriptionDate
Study C band spectrum utilization for 5G2021-01-29

Documents and Communications: [refresh]

DescriptionCategoryDate
Antenna & Building DiagramImages2021-02-10
E-Mail generated [Feb 16 2021]Correspondence2021-02-16
Incoming generated [Feb 18 2021]Correspondence2021-02-18
Grant E-mail Notification generated [Feb 24 2021]Correspondence2021-02-24
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Ericsson

Address
Attention: Matthew Hussey
Street Address: 1776 I Street, NW Suite 240
P.O. Box:
City: Washington
State: DC
Zip Code: 20006
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Hussey
First Name: Matthew
Title: Director, Public Policy
Phone Number: 202-824-0114

Explanation
Please explain in the area below why an STA is necessary:
Additional short-term testing of n77 5G radios operating in the frequency range 3.7GHz - 4.0GHz

Purpose of Operation
Please explain the purpose of operation:  Purpose is to verify that operation of cellular radio in the frequency range 3.7GHz - 4.0GHz would not harm impact the operation ofexisting C band Earth Station operating the same range. Reason for high EIRP is to get adequate characterization of path loss atdistances of 1 - 5 Kms. This would help in the development of C band product for 5G deployment.

Information
Callsign: WR9XQP
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 04/01/2021
Operation End Date: 09/01/2021

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Ericsson AIR 6488 1 Yes
Ericsson AIR 6449 4 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Matthew C. Hussey
Title of Applicant (if any): Director, Policy Policy
Date: 2021-02-10 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Plano Texas North  33  4  48 West  96  49  48 operation will be on Ericsson corporate campus 5.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   Yes
(a) Overall height above ground to tip of antenna in meters:   13.00
(b) Elevation of ground at antenna site above mean sea level in meters:   167.00
(c) Distance to nearest aircraft landing area in kilometers:   40.00
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft: Trees, additional building, .
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3700.00000000-3980.00000000 MHz MO 31.600000 kW N/A P 100MW9W OFDM

14747

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC