Request for Expedited Processing

0894-EX-ST-2013 Text Documents

DRS Sustainment Systems, Inc.

2013-09-20ELS_141539

A            t     F:                                                                        Arent Fox LLP / Attorneys at Law
    re n                X                                                 Washington, DC / New York, NY / Los Angeles, CA
                                                                                                               www.arentfox.com




     September 20, 2013

     FILED ELECTRONICALLY                                                                Jettees     E. R          j
     Mr. Nnake Nweke, Chief                                                                erirey L. humme
              +           f      +                                                       Partner
     Experimental Licensing Branch                                                       202.715.8479 pirEcr
     Office of Engineering and Technology                                                202.857.6395 rax
     Federal Communications Commission                                                   jeffrey.rummel@arentfox.com
    Washington, DC. 20554

     Re:          Request for Expedited Processing and Grant for Very Limited 8 day STA
                  from October 4, 2013 through and including October 11, 2013
                  at the 2013 McOE Robotics Limited Demonstration at Ft. Benning, GA

                  DRS Sustainment Systems, Inc.

                  Application For Special Temporary Authority
                  File No. 0894—EX—ST—2013

    Dear Mr. Nweke:

    On behalf of DRS Sustainment Systems, Inc. ("DRS SSI"), this letter is to request expedited
    processing of the above—referenced application ("Application") wherein DRS SSI has requested
    that the Commission grant special temporary authority ("STA") to permit DRS SSI to operate the
    facilities specified in the STA Request for a very limited 8 day period from October 4, 2013
    through and including October 11, 2013.

    As explained at Exhibit 1, DRS SSI has been selected to demonstrate their unmanned ground
    vehicle (UGV) technologies at the McOE Robotics Limited Demonstration
    (http://tardec.info/roboticsrodeo/) to the U.S. Army user and research and development
    communities. Applications of the UGV include "lighting the load" operations where soldiers are
    able to offload heavy gear from their backs onto the UGV thus reducing fatigue and injury from
    carrying excess equipment weight during missions. At the core of the DRS UGV is the Adaptive
    Mission Payload (AMP). The AMP is a system that provides an unparalleled level of field re—
    configurability and ease of new technology insertion for both platforms and peripherals through
    an advanced "plug and play" methodology. Thus, the AMP allows for the integration of
    navigation sensors, mission sensors, and mobility platforms to create an intelligent UGV. The
    AMP hardware is a synthesis of commercial off the shelf products including a communications
    module. This Application is filed to obtain transmitting authority for the communications module
    portion of the system.

    While the demonstration is scheduled for October 7 through October 10, 2013, obtaining a grant
    effective as of October 04 will permit DRS SSI to conduct preliminary tests of the equipment
    prior to the start of the demonstration, and permitting operations through October 11 will provide
    some flexibility in the event of delay to weather or other factors.

           1717 K Street, NW               1675 Broadway                   555 West Fifth Street, 48th Floor
           Washington, DC 20036—5342       New York, NY 10019—5820         Los Angeles, CA 90013—1065
           T 202.857.6000 F 202.857.6395   T 212.484.3900 F212.484.3990    T 213.629.7400 F213.629.7401


                                                                                     Mr. Nnake Nweke
                                                                                                  Page 2


Arent Fox


  Expedited grant is requested for this very limited 8 day period because DRS SSI was just
  informed this week of the need to obtain FCC authority for this demonstration, and it was not
  until just recently that DRS SSI and its vendor had come to agreement with respect to DRS SSI‘s
  ability to use the software associated with the radios. In addition to these reasons and the fact
  that the requested period of authority is only 8 days, expedited processing is also requested
  because:

         —     The facilities will be operated at very low power levels. As specified in the
               Application, maximum ERP of the operations will be 242 mW (for 4942.5—4987.5
               MHz), 832 mW (for 4945—4985 MHz) and 1.82W for 4950—4980 MHz).

         —     Authority is requested for only limited operation of the facilities only during the times
               the demonstration. Specifically, operation of the facilities will occur only between
               8:30am—5pm (ET).

         —     The facilities have the ability to select a communication channel within the permitted
               frequency ranges (4942.5—4987.5 MHz, 4945—4985 MHz, and 4950—4980 MHz). A
               channel is selected based on the usage of the other available channels, and the
               selection is generally made to reduce interference with other active channels.

         —     Similar expedited operations have previously been authorized for temporary
               demonstrations of this technology, for example at the AUSA annual meeting (STA
               issued under call sign WGOXAU) and at Ft. Leonard Wood (STA issued under call
               sign WFIOXXT), which should facilitate consideration and coordination of the instant
               Application.

 For the reasons set forth above, DRS SSI has demonstrated the need for expedited processing in
 this particular case. DRS SSI greatly appreciates the Commission‘s attention to this matter.

  Should any questions arise with respect to the instant Application, please do not hesitate to
  contact undersigned.

  Sincerely,




                                     rrormemnmmmontensmermiennt"

 Jeff Rammel
 Attorney for DRS Sustainment Systems, Inc.