Cellco Partnership d/b/a Verizon Wireless

0418-EX-ST-2018

Status: Grant Expired Due to New License

WM9XMH
2018-03-13

Documents and Communications: [refresh]

DescriptionCategoryDate
Grant E-mail Notification generated [Mar 13 2018]Correspondence2018-03-13
Antenna SketchImages2018-03-07
Antenna SketchImages2018-03-08
Temporary Retune ProposalText Documents2018-03-06
Temporary Retune ProposalText Documents2018-03-08
AWS 3 Temporary Retune ProposalText Documents2018-03-07
Grant E-mail Notification generated [Mar 13 2018]Correspondence2018-03-13
Antenna SketchImages2018-03-07
Antenna SketchImages2018-03-08
Temporary Retune ProposalText Documents2018-03-06
Temporary Retune ProposalText Documents2018-03-08
AWS 3 Temporary Retune ProposalText Documents2018-03-07
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Cellco Partnership d/b/a Verizon Wireless

Address
Attention: Jacob Spahr
Street Address: 8921 Research Dr.
P.O. Box:
City: Charlotte
State: NC
Zip Code: 28262
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Spahr
First Name: Jacob
Title: Principal Engineer - Systems Perf.
Phone Number: 704-900-4805

Explanation
Please explain in the area below why an STA is necessary:
Verizon will conduct short-term testing of new LTE equipment on frequencies not currently licensed to another provider.

Purpose of Operation
Please explain the purpose of operation:  Verizon is testing new LTE equipment using Band 66.

Information
Callsign: WM9XMH
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 03/19/2018
Operation End Date: 05/31/2018

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Ericsson RRUS 32 B66A 1 No
LG prototype 1 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Gregory M Romano
Title of Applicant (if any): VP & Associate General Counsel, Verizon
Date: 2018-03-05 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Greenville South Carolina North  34  52  23 West  82  19  35
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   Yes
(a) Width of beam in degrees at the half-power point:   43.25
(b) Orientation in horizontal plane:   200.00
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   Yes
(a) Overall height above ground to tip of antenna in meters:   36.58
(b) Elevation of ground at antenna site above mean sea level in meters:   284.08
(c) Distance to nearest aircraft landing area in kilometers:   3.50
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft: The antennas are part of an existing structure and deployment. This STA will only add additional frequencies to those already being transmitted by the applicant.
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2155.00000000-2160.00000000 MHz FX 10.000000 W 800.000000 W P 5M00G7W QPSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2155.00000000-2160.00000000 MHz FX 10.000000 W 800.000000 W P 5M00W7W 16QAM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2155.00000000-2160.00000000 MHz FX 10.000000 W 800.000000 W P 5M00W7W 64QAM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2155.00000000-2160.00000000 MHz FX 10.000000 W 800.000000 W P 5M00W7W 256QAM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2155.00000000-2160.00000000 MHz FX 10.000000 W 800.000000 W P 5M00K1W Amplitude

20784

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC