BAE Systems Information and Electronic Systems Integration Inc.

1954-EX-ST-2019

Status: Pending

N/A
2019-10-21

Documents and Communications: [refresh]

DescriptionCategoryDate
Exhibit 1Text Documents2019-10-21
Grant E-mail Notification generated [Nov 5 2019]Correspondence2019-11-05
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  BAE Systems Information and Electronic Systems Integration Inc.

Address
Attention: Philip D'Ancona
Street Address: 450 East Pulaski Road
P.O. Box:
City: Greenlawn
State: NY
Zip Code: 11740
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Rummel
First Name: Jeff
Title: Attorney
Phone Number: 2027158479

Explanation
Please explain in the area below why an STA is necessary:
Please See Exhibit 1

Purpose of Operation
Please explain the purpose of operation:  The testing conducted by BAE Systems is a critical part of the manufacture and delivery of military systems provided to the Armed Forces in support of Homeland Security and war efforts. In support of Internal Research and Development, the purpose of these tests is to test on a temporary basis a new modulated communications waveform that will facilitate the transmission of data messages from one unit to another while interleaving other missions on the same hardware. A waiver of the Station ID requirements of 47 CFR §5.115(a) is respectfully requested. Please See Exhibit 1

Information
Callsign: WP9XMK
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 11/22/2019
Operation End Date: 05/22/2020

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Please See Exhibit 1 1 1 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Erin Poitras
Title of Applicant (if any): Radiation Safety Program Manager
Date: 2019-10-17 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
North  42  48  39 West  71  29  18 Temporary Fixed Ground Operations. Merrimack, NH 0.50
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   Yes
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 24.00000000-24.05000000 GHz MO 20.000000 W 12619.000000 W P 1M00G1D DQPSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 24.05000000-24.25000000 GHz MO 20.000000 W 12619.000000 W P 1M00G1D DQPSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 24.39900000-24.40100000 GHz MO 20.000000 W 12619.000000 W P 1M00G1D DQPSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 24.45000000-24.65000000 GHz MO 20.000000 W 12619.000000 W P 1M00G1D DQPSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 24.65000000-24.75000000 GHz MO 20.000000 W 12619.000000 W P 1M00G1D DQPSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 24.75000000-25.05000000 GHz MO 20.000000 W 12619.000000 W P 1M00G1D DQPSK

22247

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC