FILED ELECTRONICALLY                                                           Jeffrey E. Rummel
Mr. Anthony Serafini, Chief                                                    Partner
Experimental Licensing Branch                                                  202.715.8479 DIRECT
Office of Engineering and Technology                                           202.857.6395 FAX
Federal Communications Commission                                              jeffrey.rummel@arentfox.com
Washington, DC. 20554

Re:       Request for Expedited Processing and Grant
          for Limited 3 Day STA Transmissions
          On November 6, 7 and 8, 2018

          BAE Systems Information and Electronic Systems Integration Inc.
          Application For Special Temporary Authority
          File No. 1847-EX-ST-2018

Dear Mr. Serafini:

On behalf of BAE Systems Information and Electronic Systems Integration Inc. (“BAE
Systems”), this letter is to request expedited processing of the above-referenced application
(“STA Request”) wherein BAE Systems has requested that the Commission grant special
temporary authority (“STA”) to permit BAE Systems to operate the facilities specified in the
STA Request for an extremely limited 3 day period of time, on November 6, 7 and 8, 2018.

As explained at Exhibit 1 to the STA Request:

      -   The proposed airborne testing at a private use operating airfield in Green Cove Springs,
          FL will be in support of a joint venture between BAE and the US Army to demonstrate
          an option for increased performance of the fielded Common Missile Warning System.
          This is a quick reaction project aimed at providing added protection to aircrews in hostile
          areas.

      -   The technical and operational characteristic of the transmissions will ensure mitigation of
          impact to co-channel operations, as follows:

          -      Only three airborne test events are anticipated during this three day period, with
                 each event not to exceed 1.6 hours of flight time

          -      The duration of each transmission will not to exceed 150 milliseconds


       -       The beam is narrow and fixed focused and does not scan, the computer steers
               the antenna to the target before radiating

       -       The target (located on the ground) is at a fixed location

In light of the very short time period needed for transmissions, the technical and operational
factors described above designed to mitigate impact, BAE Systems submits that expedited
processing and grant of this STA Request is in the public interest.

Should any questions arise with respect to the instant Application, please do not hesitate to
contact undersigned.

Sincerely,


Jeff Rummel
Attorney for BAE Systems Information and
  Electronic Systems Integration Inc.



Document Created: 2018-11-30 05:50:19
Document Modified: 2018-11-30 05:50:19

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC