Request for Expedited Processing and Grant

1832-EX-ST-2018 Text Documents

BAE Systems Information and Electronic Systems Integration Inc.

2018-10-26ELS_218758

                                                                                       Arent Fox LLP / Attorneys at Law
                                                    Los Angeles, CA / New York, NY / San Francisco, CA / Washington, DC
                                                                                                      www.arentfox.com


October 26, 2018

FILED ELECTRONICALLY                                                           Jeffrey E. Rummel
Mr. Anthony Serafini, Chief                                                    Partner
Experimental Licensing Branch                                                  202.715.8479 DIRECT
Office of Engineering and Technology                                           202.857.6395 FAX
Federal Communications Commission                                              jeffrey.rummel@arentfox.com
Washington, DC. 20554


Re:       Request for Expedited Processing and Grant
          for Limited 2 Day STA Transmissions
          On October 30 and 31, 2018

          BAE Systems Information and Electronic Systems Integration Inc.
          Application For Special Temporary Authority
          File No. 1832-EX-ST-2018

Dear Mr. Serafini:

On behalf of BAE Systems Information and Electronic Systems Integration Inc. (“BAE
Systems”), this letter is to request expedited processing of the above-referenced application
(“STA Request”) wherein BAE Systems has requested that the Commission grant special
temporary authority (“STA”) to permit BAE Systems to operate the facilities specified in the
STA Request for an extremely limited 2 day period of time, on October 30 and 31, 2018.

As explained at Exhibit 1 to the STA Request:

      -   The proposed ground testing at BAE Systems’ Merrimack, NH will be in support of a
          joint venture between BAE and the US Army to demonstrate an option for increased
          performance of the fielded Common Missile Warning System. This is a quick reaction
          project aimed at providing added protection to aircrews in hostile areas.

      -   The technical and operational characteristic of the transmissions will ensure mitigation of
          impact to co-channel operations, as follows:

          -      The duration of each transmission will not to exceed 150 milliseconds

          -      The beam is narrow and fixed focused and does not scan, the computer steers
                 the antenna to the target before radiating

          -      The target (located on the ground) is at a fixed location


In light of the very short time period needed for transmissions, the technical and operational
factors described above designed to mitigate impact, BAE Systems submits that expedited
processing and grant of this STA Request is in the public interest.

Should any questions arise with respect to the instant Application, please do not hesitate to
contact undersigned.

Sincerely,


Jeff Rummel
Attorney for BAE Systems Information and
  Electronic Systems Integration Inc.



Document Created: 2018-10-26 14:56:27
Document Modified: 2018-10-26 14:56:27

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC