Exhibit 1

0851-EX-CN-2017 Text Documents

BAE Systems Information and Electronic Systems Integration Inc.

2017-11-29ELS_201731

                                                                                 Exhibit 1

       1.     Introduction

        By the instant application (“Application”), BAE Systems Information and Electronic
Systems Integration Inc. (“BAE Systems”) requests that the Commission grant a 2 year
conventional experimental license to permit BAE Systems to operate the facilities (the
“Facilities”) specified in the instant Application.

       2.     Purpose of the Operation

        The testing conducted by BAE Systems (a continuation of the operations previously
authorized under STA pursuant to call sign WL9XII) is a critical part of the manufacture and
delivery of military systems provided to the Armed Forces in support of Homeland Security as
well as war efforts.

       The purpose of this test is to permit continued demonstration of proof of concept
operations as support for the development of a counter-RPG tracking radar for Intelligence and
Information Warfare Directorate (I2WD) of the US Army Communications-Electronics
Research, Development and Engineering Center (CERDEC), in support of the following
government contract and for Internal Research and Development:

       Contract Number:      W56KGU-15-C-0067
       Agency Customer:      Intelligence and Information Warfare Directorate (I2WD)
                             ATTN: RDER-IWR-AS (MAPS)
                             6003 Combat Drive
                             APG, MD 21005
       Contract POC:         Francis (Frank) L. Gillan
                             Tel: (443) 861-1407

NOTES:

   -   The license is requested to permit operation in support of the above contract due to
       multiple additional option periods expected under the contract AND ALSO for Internal
       Research and Development.

   -   Therefore, grant of the license with Station Class XT is requested

   -   A waiver of the Station ID requirements of 47 CFR §5.115(a) is respectfully requested.

       3.     Other Issues

              A.       Antenna Data

               For the convenience of the Commission, the following chart defines certain
       specifications relating to the antennas that are to be used in the experiment:




                                               1


                Model        # Units     Exper.        Frequency
Mfg.                                                                 Gain          Beamwidth
                Number                   Yes/No        Range
                                                                                     2 degrees, E-
                MESA-          4 per       No          23.7 – 24.5                 Plane
Echodyne                                                             21 dBi
                K-EVU          radar                   GHz                         7.5 degrees, H-
                                                                                   Plane
                                                                                   17.5 degrees, E-
Fairview
                               4 per       No          18 – 26.5                   Plane
Microwave       SH142-20                                             20 dBi
                               radar                   GHz                         17.8 degrees, H-
or equivalent
                                                                                   Plane


                  B.      RF Sources

                   The transmitter will be a BAE Systems custom design. The signal is created by a
           crystal referenced PLL, then amplified and transmitted through an electronically scanned
           antenna. The waveform is CW, tunable between 23.7 and 24.5 GHz, transmitting a pair
           of frequencies separated by 50 KHz to 2 MHz; either simultaneously or alternating at a
           rate between 10 kHz and 70 kHz.

                  BAE Systems notes that the transmissions will be non-pulsed signals.

                  The transmitter power will be adjusted to assure that the requested ERP level is
           not exceeded.


                  C.      Stop Buzzers

                  Stop Buzzers:

                  Primary: Eric Rundquist, 603 809-8960
                  Alternate: Jake Freedman 603 867-1028




                                                   2



Document Created: 2017-11-29 15:14:37
Document Modified: 2017-11-29 15:14:37

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC