Exhibit 1

0442-EX-ST-2018 Text Documents

BAE Systems Information and Electronic Systems Integration Inc.

2018-03-07ELS_206049

                                                                                   Exhibit 1


       1.      Introduction

        By the instant application (“Application”), BAE Systems Information and Electronic
Systems Integration Inc. (“BAE Systems”) requests that the Commission grant Special
Temporary Authority (“STA”) for a six month period from April 9- October 9, 2018 to operate
the facilities (the “Facilities”) specified in the instant application.


       2.      Purpose of the Operation

        The testing conducted by BAE Systems is a critical part of the manufacture and delivery
of military systems provided to the Armed Forces in support of Homeland Security as well as
war efforts.

       In support of both Internal Research and Development as well as the contract listed
below, the purpose of these tests is to determine the viability of detecting small arms fire
pursuant to protecting military helicopter pilots operating regions with hostile fire.

       In addition to IR&D, the following government contract will be supported by these
operations:

               Customer/Agency:         US Army Research Laboratory
               Contract Number:         W911NF-17-2-0139
               Government POC:          Dave Wikner 301-394-0865

       A waiver of the Station ID requirements of 47 CFR §5.115(a) is respectfully requested.


       3.      Other Issues

               A.      Transmitting Equipment

                                                                  Modulating     Experimental?
        Manufacturer         Model No       RF Power    # Units                     Yes/No
                                                                  Signal(s)
                                                                  No modula-
        BAE Systems          N/A            5 W, CW         1                         Yes
                                                                  tion




                                                 1
AFDOCS/16106805.1


                B.      Antenna Data

                     Model                Width of Beam       Orientation       Orientation
    Manufacturer               Gain       @ 1/2 Power Point
                     Number                                   in Horiz. Pane    in Vert. Pane
                                                              Depends on site
                                                              geometry;         Electronically
                     MESA-K-
    Echodyne                   21 dB      4° az x 12° el      electronically    scanned 0+/-40
                     EVU
                                                              scanned +/- 60    degrees.
                                                              degrees




       4.      Interference Mitigation

        BAE Systems hereby advises the Commission that the tests to be conducted under the
requested authorization are to be conducted at the Sig Sauer Academy, 233 Exeter Rd, Epping,
NH. All electronics are within a metal enclosure. The transmission will be placed within the
allocated bandwidth in order to minimize interference. The operation will be sporadic over the 6
month period.


       5.      Stop Buzzers

               Primary: Bruce Partin, (603) 885-1020
               Alternate: Eric Rundquist, (603) 809-8960




                                                 2
AFDOCS/16106805.1



Document Created: 2018-12-05 19:25:46
Document Modified: 2018-12-05 19:25:46

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC