DescriptionCategoryDate
E-Mail generated [Apr 26 2021]Correspondence2021-04-26
Incoming generated [Apr 27 2021]Correspondence2021-04-27
E-Mail generated [May 4 2021]Correspondence2021-05-04
Incoming generated [May 19 2021]Correspondence2021-05-19
E-Mail generated [May 20 2021]Correspondence2021-05-20
E-Mail generated [May 22 2021]Correspondence2021-05-22
E-Mail generated [Jun 3 2021]Correspondence2021-06-03
E-Mail generated [Jun 3 2021]Correspondence2021-06-03
Incoming generated [Jun 1 2021]Correspondence2021-06-01
Grant E-mail Notification generated [Jun 14 2021]Correspondence2021-06-14
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Astronics Armstrong Aerospace d/b/a Astronics CSC

Address
Attention: Matthew Lukasiewicz
Street Address: 804 S. Northpoint Blvd
P.O. Box:
City: Waukegan
State: IL
Zip Code: 60085
Country: United States
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Lukasiewicz
First Name: Matthew
Title: Manager, Aircraft Certification
Phone Number: 8478213000x837

Explanation
Please explain in the area below why an STA is necessary:
The Special Temporary Authorization is necessary due to transmission at up to 5W (EIRP) output power in the 2.4Ghz and 5Ghz wi-fi frequency bands.

Purpose of Operation
Please explain the purpose of operation:  The purpose of operation is due to on-aircraft EMI testing in support of an FAA STC project for certification of wireless data technologies on Boeing 757-200 Series Aircraft.

Information
Callsign: WS9XEG
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 06/22/2021
Operation End Date: 12/22/2021

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
ETS-Lindgren 3181 2 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Matthew Lukasiewicz
Title of Applicant (if any): Manager, Aircraft Certification
Date: 2021-04-26 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Atlanta Georgia North  33  38  35 West  84  24  48 4.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2400.00000000-2500.00000000 MHz FX 113.000000 W 5.000000 W P 0.00100000 % 1K60P0N None
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 5170.00000000-5170.00000000 MHz FX 113.000000 W 5.000000 W P 0.00100000 % 1K60P0N None
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 5300.00000000-5300.00000000 MHz FX 113.000000 W 5.000000 W P 0.00100000 % 1K60P0N None
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 5580.00000000-5580.00000000 MHz FX 113.000000 W 5.000000 W P 0.00100000 % 1K60P0N None
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 5825.00000000-5825.00000000 MHz FX 113.000000 W 5.000000 W P 0.00100000 % 1K60P0N None