Alion Science and Technology

0472-EX-ST-2021

Status: Pending


2021-03-29

Documents and Communications: [refresh]

DescriptionCategoryDate
Purpose for STA Alion Science and TechnologyText Documents2021-03-29
Purpose for STA Alion Science and TechnologyText Documents2021-03-29
Grant E-mail Notification generated [Apr 14 2021]Correspondence2021-04-14
Grant E-mail Notification generated [Apr 14 2021]Correspondence2021-04-14
Purpose for STA Alion Science and TechnologyText Documents2021-03-29
Purpose for STA Alion Science and TechnologyText Documents2021-03-29
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Alion Science and Technology

Address
Attention: Anthony Hart
Street Address: 301 Plainfield Rd, Suite 180
P.O. Box:
City: Syracuse
State: NY
Zip Code: 13212
Country: United States
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Hart
First Name: Anthony
Title: Electrical Engineer
Phone Number: 7169605377

Explanation
Please explain in the area below why an STA is necessary:
Use our systems to record and mimic the electronic signature of commercial boat radar systems to the attendees of Trident Spectre 2021

Purpose of Operation
Please explain the purpose of operation:  The purpose of this operation is to display our capabilities to Naval Special Warfare Group 10 at Trident Spectre 2021.

Information
Callsign: WR9XXI
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 04/14/2021
Operation End Date: 06/14/2021

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Alion Science and Technology Noisy Cricket 1 Yes
Alion Science and Technology Nano Cricket 1 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Anthony Hart
Title of Applicant (if any): Electrical Engineer
Date: 2021-03-29 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Virginia Beach Virginia North  36  55  30 West  76  9  15 Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VA 15.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9.30000000-9.50000000 GHz MO 20.000000 W 36.600000 W M 0.00000100 % 60M0F2N FM Pulse

14608

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC